My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT LIGHTING FIXTURES CORP YARD
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
25C - AGMT LIGHTING FIXTURES CORP YARD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:39:08 PM
Creation date
8/30/2018 7:26:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25C
Date
9/4/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anaheim Convention Center <br />$360,347 Annual Energy Savings <br />PROJECT DESCRIPTION <br />Anaheim Convention center awarded Energy Retrofit Co. a contract to replace their outdated T12 Fluorescent HO <br />fixtures. After the initial contract was completed, the facilities staff requested ERC to deslgn•build additional work to <br />complete the exterior lighting, office lighting, and parking garage lighting. The additional lighting work was done as a <br />'change order to the initial.contract and was paid for using a combination of U.S. Department of Energy's Energy <br />Efflclency and Conservation Block Grant (EECB4) Program and Anaheim Utility Rebates. <br />Project Images <br />SCOPE OF WORK <br />✓ Replaced over 2000 T12 fluorescent fixtures with new low wattage fixtures with bi-level occupancy controls <br />In the parking garage. <br />✓ Retrofitted all Interior office lighting and all common areas with new low wattage system. <br />✓ Energy savings exceeded $380K per year. <br />✓ Overall project cost = $785K. <br />PROJECT CHALLENGES & SOLUTIONS <br />✓ The convention center and parking garage were extremely busy— operating 24 hours per day, every day of <br />the year, with no down time for an installation to be scheduled. <br />• The ERC installation team worked closely with faciliities management to coordinate product delivery and <br />installation between convention center event dates, <br />✓ The ERC Installation team worked double shifts to ensure that all 2,000+ convention center hall fixtures <br />were safely installed in under 45 days, with no impact to the centers schedule of events. <br />QEMER15Y RE RCIFrr Co. <br />25C-97 <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.