Laserfiche WebLink
goods need to be accessible or it will involve more staff or less staff actually supervising the inmates <br />Standards - Title 24, refers to two types of storage including (1) institutional and personal storage - 80 <br />cubic feet per inmate, and (2) safety equipment storage - secure area for safety equipment such as fire <br />extinguishers, self-contained breathing apparatus, wire and bar cutters, emergency lights, etc. It also <br />speaks of janitorial closets - at least one closet in the security area. <br />EXISTING CONDITIONS AT THE SANTA ANA CITY JAIL FACILITY <br />The Santa Ana City Jail is a modern detention facility that has been very well maintained. It is well <br />appointed with upscale finishes such as porcelain fixtures, granite flooring and trim from the same quarry <br />used throughout the building. On a clear day, you can see Catalina Island and Angels Stadium from the <br />roof that boasts actual granite trim. The maintenance office includes several work stations, break stations <br />and a storage and supply room. <br />The Jail facility's maintenance staff is to be commended for their hard efforts to keep the facility in <br />excellent shape and many original equipment pieces are still in good working order. Approximately 95% <br />of the equipment within the facility is original. Every effort is made by staff to maintain upkeep as cost <br />effectively as possible, all while being environmentally conscious. The Jail has already undergone an <br />ultra-low wattage replacement and is now moving towards LED as bulbs need replacement. The toilets <br />have been reduced from 5.5 to 3.5 gallons per flush, and the use of ultra shower heads has reduced <br />water usage to 2.5 gallons per minute for efficiency and conservation. Forty (40) to 45 of the Jail's HVAC <br />units have been replaced with VFD models two to three years ago with only a few remaining to be <br />upgraded. The maintenance team also adjusts the damper to swap out cool, clean air for four to five <br />hours a day in the morning to help cool the building and limit chiller use. <br />There is ample storage located throughout the facility, with some exceptions which could be addressed <br />by relocating the stored items to a larger storage room. The largest storage room is used for general <br />storage, items to be repaired, extra furniture, and some commissary supplies. There is a desk for the <br />storage aide employee use when receiving deliveries or performing inventory. There is one storage room <br />on each floor for each housing unit that stores soap, shampoo, toilet paper, janitorial supplies, and more. <br />There is additional storage located on the roof in the mechanical room with the enclosed equipment. The <br />primary air handlers on the roof are original. There is also storage for air filters, carpet, belts, and more. <br />While most of the basement tunnel is in good working order, there are several large wall cracks that have <br />been repaired but not repainted. Staff noted there were issues with moisture seepage through the slab in <br />the past. Core drilling scars are present throughout the building due to an aquifer found under the <br />foundation after construction. There were also small piles of debris that had not been removed. <br />There are five elevators in the facility, three for inmates and two for staff. The elevator manufacturer went <br />out of business one year after they were purchased. Service Elevator 1 was offline for approximately <br />three years and was recently fixed after ordering custom parts at a cost of approximately $50,000 to <br />repair. They have had to go as far as closing operations because only one of five elevators in the facility <br />were working. The Jail has a maintenance contract for the elevators and has been working on upgrading <br />them one at a time. The elevator operational issues have almost been resolved resulting in a significant <br />cost savings for the City. <br />There is a series of master keys for the facility based on a pyramid or keying hierarchy. The keys used <br />are Medico and angle cut, making them harder to duplicate and pick. Cameras were upgraded to HD <br />Digital IP in 2016 from the original Legacy system. Porcelain sinks, toilets, and wood doors are installed <br />throughout the building excluding the administrative segregation (Ad Seg) unit. <br />The total space allocated to the Maintenance/Storage/Utility function is 25,409 square feet <br />Observations and Evaluations - Consultant Evaluation Rating: 2.6 Very Adequate <br />Appendix B. <br />65A-164 <br />