i <br />Project: Santa Ana Jail Reuse <br />Title: Budget Estimate <br />Date: June 12, 2018 <br />CSI <br />Description Re-entry <br />Data Center <br />Homeless <br />Center <br />Office Space <br />2 <br />Existing Conditions $368,956 <br />$372,736 <br />$609,031 <br />$1,055,237 <br />3 <br />Concrete $16,913 <br />$0 <br />SO <br />$0 <br />4 <br />Mason $0 <br />$0 <br />so <br />$0 <br />5 <br />Metals $79,950 <br />$155,390 <br />$12,300 <br />$41,000 <br />6 <br />Wood, Plastics & Composites $20,500 <br />$49,856 <br />$20,500 <br />$709,153 <br />7 <br />Thermal & Moisture Protection $83,2921 <br />$24,764 <br />$0 <br />$27,552 <br />8 <br />Openings $10,250 <br />$0 <br />$0 <br />$196,800 <br />9 <br />Finishes S553,348 <br />$216,661 <br />$297,916 <br />$2,348,572 <br />10 <br />Specialties $0 <br />$0 <br />$0 <br />$0 <br />11 <br />Equipment $10,250 <br />$401,800 <br />$10,250 <br />$2,988,254 <br />12 <br />Furnishings $0 <br />$0 <br />so <br />$0 <br />13 <br />Special Construction $46,740 <br />$46,740 <br />$909,616 <br />$116,850 <br />14 <br />Conveying Systems s0 <br />$0 <br />$0 <br />$153,750 <br />21 <br />Fire Suppression $73,800 <br />$436,240 <br />$0 <br />$0 <br />22 <br />Plumbing $14,350 <br />s0 <br />$0 <br />$122,051 <br />23 <br />HVAC $44,075 <br />$1,111,100 <br />$0 <br />$232,596 <br />26 <br />Electrical $183,299 <br />$3,585,860 <br />$201,586 <br />$1,627,463 <br />27 <br />Communications $44,075 <br />$629,350 <br />$7,688 <br />$1,663,221 <br />28 <br />Electronic Safety and Security $43,050 <br />$119,392 <br />$133,117 <br />$199,787 <br />Subtotal $1,592,847 <br />$7,149,890 <br />$2,202,003 <br />$11,482,287 <br />General Contractor Job Overt 10.00% $159,285 <br />$714,989 <br />$220,2001 <br />$1,148;229 <br />General Contractor Markup 5.00% $87,607 <br />$393,244 <br />$121.1101 <br />$631,526 <br />General Contractor Bond 2.25% $41,394 <br />$185,808 <br />$57,2251 <br />$298,396 <br />Design Contingency 20.00% $376,227 <br />$1,688,786 <br />$520,108 <br />$2,712,088 <br />Markel Factor 4.00% $90,294 <br />$405,309 <br />$124,826 <br />$650,901 <br />Construction Cost - June 2018 $2.348.000. <br />$10.538.000 <br />$3 245 000 <br />$16,92-3,00-0- <br />16923 000Escalation <br />EscalationNIC 0.00°/a $0 <br />$0 <br />$0 <br />$0 <br />Total Construction Cost $2,348,0001 <br />$10,538,000 <br />$3,245,000 <br />$16923000 <br />Assumed existing fire life safety systems of the 1st and 2nd levels are in working conditions and <br />does not require repair / replace / upgrade. <br />The existing floor slabs on the 3rd & 4th floor could requires structural upgrade for the weight of <br />the data rack systems which will have significant cost impact <br />Assumed existing building will meet the current codes and does not requires code upgrade <br />Site work costs (if any) are not included. <br />While allowances for the cost of data racks are included, the cost of data equipment and <br />associated peripherals are'NOT included. <br />Appendix E. <br />65A-207 <br />