My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - CUP2018-02_2000 W ALTON AVE
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
03-12-2018
>
3 - CUP2018-02_2000 W ALTON AVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 10:07:19 AM
Creation date
9/13/2018 10:05:01 AM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T RAFFIC I MPACT A NALYSIS <br />S EPTEMBER 2017 <br />C HRIST O UR S AVIOR C ATHOLIC P ARISH <br />S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA <br /> <br />P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» 21 <br />CONCLUSION <br />Based on the results of this TIA, the proposed development of the Christ Our Savior Catholic Parish <br />could be implemented without significantly impacting the nearby circulation system. All study area <br />intersections are anticipated to operate at a satisfactory LOS in the weekday a.m. and p.m. peak <br />hours and the Sunday morning peak hour with the addition of project traffic. LSA considered special <br />events and determined the effect of these events would be no greater than the analyzed Sunday <br />services. LSA examined the project access driveways and found that the driveway and gated access <br />would function adequately without interference to the arterial street system. <br /> <br />3-72
The URL can be used to link to this page
Your browser does not support the video tag.