PROJECT TITLE:
<br />Residential Street Repair Program
<br />PROJECT CATEGORY:
<br />Street Improvements
<br /> Neighborhood Street Resurfacing
<br />PROJECT NEED:
<br />The local street network has 316 miles citywide. In
<br />2007 the City embarked on an extensive citywide
<br />improvement plan to rehabilitate and slurry seal the
<br />majority of the network. By the end of 2015, the City
<br />has completed rehabilitating all asphalt residential
<br />streets and currently working toward improving all
<br />residential concrete streets.
<br />PROJECT DESCRIPTION:
<br />This project entails the rehabilitation of existing
<br />roadway pavement for local streets. The project will
<br />include the removal and replacement of existing
<br />concrete streets. Various replacement pavement
<br />strategies will be investigated to determine the most
<br />cost effective and maintainable treatment. Minor
<br />concrete repair to severely damaged or missing curbs,
<br />gutters, sidewalks, and wheelchair ramps will also be
<br />included. Work in FY 18/19 will focus on the Heninger
<br />Neighborhood.
<br />PROJECT FUNDS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25
<br />CDBG Projects $774,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000
<br />TOTAL $774,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000
<br />PROJECT COSTS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25
<br />Construction $699,000 $925,000 $925,000 $925,000 $925,000 $925,000 $925,000
<br />Engineering $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $75,000
<br />TOTAL $774,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000
<br />LOCATION MAP
<br />CONTACT:DATE:
<br />18-Apr-2018
<br />AGENCY:
<br />Public Works Agency
<br />DIVISION:
<br />Design Engineering Jason Gabriel, Principal Civil Engineer
<br />- 14 -
<br />CITY OF SANTA ANA FY 18/19
<br />CAPITAL IMPROVEMENT PROJECT WORKSHEET
<br />1-33
|