Laserfiche WebLink
PROJECT TITLE: <br />Bristol Street Improvements and Widening: <br />Phase 4 - Warner to St. Andrew <br />PROJECT CATEGORY: <br />Street Improvements <br /> Street/Bridge Improvements & Widening <br />PROJECT NEED: <br />Bristol Street from Warner Avenue to St. Andrew <br />Place (Phase 4) is part of the City's plan to widen <br />Bristol Street from Warner Avenue to Memory Lane, <br />which was approved by City Council in 1990 and <br />reevaluated in 2015. Existing roadway has only 2 lanes <br />in each direction and is operating at a LOS F. This <br />widening is needed to improve traffic flow and create <br />complete streets features. <br />PROJECT DESCRIPTION: <br />The Bristol Street Improvements project was planned <br />and designed to incorporate complete street concepts <br />with storm drain quality features. The improvements <br />include widening of the street from four lanes to six <br />lanes, with bus turnouts, raised median, bike lanes, and <br />sound walls. The project also brings native and organic <br />landscaping that beautifies a fully developed urban <br />area. <br />PROJECT FUNDS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />TSIA AREA F (PY)$1,000,000 <br />TOTAL $1,000,000 <br />PY = Funds awarded in Multiple Prior Fiscal Years <br />PROJECT COSTS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />Right-Of-Way $1,000,000 <br />TOTAL $1,000,000 <br />LOCATION MAP <br />CONTACT:DATE: <br />18-Apr-2018 <br />AGENCY: <br />Public Works Agency <br />DIVISION: <br />Design Engineering Sean Thomas, Acting Senior Civil Engineer <br />- 19 - <br />CITY OF SANTA ANA FY 18/19 <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />1-38