ELECTRICAULIGHTING• IRVINE, CA,
<br />Mr. Mazen Kassar has more than 25 years of experience in electrical
<br />> ' "
<br />engineering and industry standard that include electrical engineering
<br />>''Education::
<br />staff management, project management, construction management
<br />BS Electrical,: Engineerfng;
<br />and supervision, water and wastewater treatment, petro -chemical
<br />Califomia.State .University ,.
<br />design, and environmental soil and groundwater treatment. His
<br />":-Long`Breach; 1990':.'.
<br />background Includes designing medium and low voltage power
<br />;Registrations'
<br />distribution, designing instrumentation, control systems and
<br />SCADA systems for a wide -variety of projects, and the Installation
<br />'"Professional Electrical
<br />of electrical systems for remediation projects, Including soil vapor
<br />'E ngineeF�CaliforniarNo.= ,
<br />extraction systems and groundwater pump -and -treat systems. Other
<br />1580.9, 1998
<br />experience Includes, working with utility companies to provide new
<br />Genefal Construe#Ion Class B
<br />electrical service to new projects, working with local Building and
<br />No.7I7845;:Ca1ifomia;:2008
<br />Safety Departments to obtain Pian Check and construction permits,
<br />tor.-.'. C,,.10: Electncal,.,
<br />Paid trouble shooting of electrical and mechanical systems, system
<br />California Class G- Specialty;
<br />commissioning and startup, problem solving, and managing an
<br />No.77,7845,2000 "•.. ; < i.::; i
<br />operation and maintenance department. He has strong knowledge In
<br />.
<br />MS Office and AutoCAD.
<br />ETAP'ElecVicef Power.::'.'r` =i
<br />Modeling,. 2010':-
<br />Relevant Experience
<br />Project Management I & 11 '
<br />SJVWB-ERRP Phase 1 Well Equipping and Treatment
<br />2012;:
<br />Facilities Preliminary Design, Eastern Municpal Water
<br />District, San Jacinto, CA. Supervising the electrical design
<br />GE aridAllena3radley,ALC',;
<br />for a project that Includes preparation of a Preliminary Design
<br />pfogrammmg; 2004"
<br />Report with an evaluation of the pipeline corridors from four wells
<br />GEflnte)lution and'`
<br />to a central treatment plant, review of treatment technology for
<br />Wonderware SCADA
<br />iron and manganese removal,. disinfection using chloramines,
<br />ro ram
<br />booster pump station and reservoir and well equipping evaluation.
<br />Vapor.elextraction'
<br />Preliminary design drawings will be prepared to a 30% design level
<br />that addresses the civil site, mechanical, process, electrical and
<br />Grouridwater.•Treatmen[;::1931,''i
<br />Instrumentation components of the treatment and blending facility,
<br />OSHA 8 -hour Hazardous
<br />site work and pipeline plan and profile sheets. Project field work will
<br />r""Waste Operations;A'rinual:
<br />consist of a geotechnical investigation of the well sites, treatment
<br />Refresher Training,
<br />plant and pipeline corridors, aerial and ground survey, potholing and
<br />O$HA'B-lioiir.Haiardous..'"':::
<br />ccrro slop analysis.
<br />Waste: , Operations Site :
<br />Well 21&22 Desalter Plant, Irvine Ranch Water District,
<br />SuperiiisgrTranng;1992 ` , .
<br />Irvine, CA. Wells 21 and 22 Reverse Osmosis (RO) Treatment
<br />OSHA hour H.azardous
<br />Plant is designed to remove solids from well water and provide
<br />..40
<br />Waste'Ope...... s Training, .
<br />potable water source. The design consisted of providing all design-
<br />build services to construct a fully operational reverse osmosis
<br />water treatment plant including, but not limited to: Pretreatment
<br />.ro .essional;AffIll. Ions
<br />chemical systems, high pressure feed pumps, reverse osmosis
<br />Instttute of ElecSrical and
<br />treatment trains, membrane clean -In-place system, decarbonators,
<br />Electionics:Eng
<br />posttreatment chemical systems, supervisory control and data
<br />years.of Experience
<br />acquisition, product water pump station, treatment plant building
<br />and electrical and instruments -tion system, The RO Plant was sized
<br />to produce 6.27 mgd of water. Water will be treated to remove salts
<br />(TDS) and nitrates. Managed the electrical design of the electrical
<br />_...
<br />power and control system, preparing technical specifications,
<br />25F-68
<br />
|