Laserfiche WebLink
ELECTRICAULIGHTING• IRVINE, CA, <br />Mr. Mazen Kassar has more than 25 years of experience in electrical <br />> ' " <br />engineering and industry standard that include electrical engineering <br />>''Education:: <br />staff management, project management, construction management <br />BS Electrical,: Engineerfng; <br />and supervision, water and wastewater treatment, petro -chemical <br />Califomia.State .University ,. <br />design, and environmental soil and groundwater treatment. His <br />":-Long`Breach; 1990':.'. <br />background Includes designing medium and low voltage power <br />;Registrations' <br />distribution, designing instrumentation, control systems and <br />SCADA systems for a wide -variety of projects, and the Installation <br />'"Professional Electrical <br />of electrical systems for remediation projects, Including soil vapor <br />'E ngineeF�CaliforniarNo.= , <br />extraction systems and groundwater pump -and -treat systems. Other <br />1580.9, 1998 <br />experience Includes, working with utility companies to provide new <br />Genefal Construe#Ion Class B <br />electrical service to new projects, working with local Building and <br />No.7I7845;:Ca1ifomia;:2008 <br />Safety Departments to obtain Pian Check and construction permits, <br />tor.-.'. C,,.10: Electncal,., <br />Paid trouble shooting of electrical and mechanical systems, system <br />California Class G- Specialty; <br />commissioning and startup, problem solving, and managing an <br />No.77,7845,2000 "•.. ; < i.::; i <br />operation and maintenance department. He has strong knowledge In <br />. <br />MS Office and AutoCAD. <br />ETAP'ElecVicef Power.::'.'r` =i <br />Modeling,. 2010':- <br />Relevant Experience <br />Project Management I & 11 ' <br />SJVWB-ERRP Phase 1 Well Equipping and Treatment <br />2012;: <br />Facilities Preliminary Design, Eastern Municpal Water <br />District, San Jacinto, CA. Supervising the electrical design <br />GE aridAllena3radley,ALC',; <br />for a project that Includes preparation of a Preliminary Design <br />pfogrammmg; 2004" <br />Report with an evaluation of the pipeline corridors from four wells <br />GEflnte)lution and'` <br />to a central treatment plant, review of treatment technology for <br />Wonderware SCADA <br />iron and manganese removal,. disinfection using chloramines, <br />ro ram <br />booster pump station and reservoir and well equipping evaluation. <br />Vapor.elextraction' <br />Preliminary design drawings will be prepared to a 30% design level <br />that addresses the civil site, mechanical, process, electrical and <br />Grouridwater.•Treatmen[;::1931,''i <br />Instrumentation components of the treatment and blending facility, <br />OSHA 8 -hour Hazardous <br />site work and pipeline plan and profile sheets. Project field work will <br />r""Waste Operations;A'rinual: <br />consist of a geotechnical investigation of the well sites, treatment <br />Refresher Training, <br />plant and pipeline corridors, aerial and ground survey, potholing and <br />O$HA'B-lioiir.Haiardous..'"'::: <br />ccrro slop analysis. <br />Waste: , Operations Site : <br />Well 21&22 Desalter Plant, Irvine Ranch Water District, <br />SuperiiisgrTranng;1992 ` , . <br />Irvine, CA. Wells 21 and 22 Reverse Osmosis (RO) Treatment <br />OSHA hour H.azardous <br />Plant is designed to remove solids from well water and provide <br />..40 <br />Waste'Ope...... s Training, . <br />potable water source. The design consisted of providing all design- <br />build services to construct a fully operational reverse osmosis <br />water treatment plant including, but not limited to: Pretreatment <br />.ro .essional;AffIll. Ions <br />chemical systems, high pressure feed pumps, reverse osmosis <br />Instttute of ElecSrical and <br />treatment trains, membrane clean -In-place system, decarbonators, <br />Electionics:Eng <br />posttreatment chemical systems, supervisory control and data <br />years.of Experience <br />acquisition, product water pump station, treatment plant building <br />and electrical and instruments -tion system, The RO Plant was sized <br />to produce 6.27 mgd of water. Water will be treated to remove salts <br />(TDS) and nitrates. Managed the electrical design of the electrical <br />_... <br />power and control system, preparing technical specifications, <br />25F-68 <br />