SURVEYING/MAPPING- IRVINE, CA,
<br />Mr. Cullison has fifteen years of experience in land surveying for
<br />municipal, federal and private sector projects Including control
<br />Education
<br />network surveys, boundary and topographic surveys, subdivision
<br />bis:, Geography; Texas: State
<br />mapping, as -built surveys, and construction staking for a wide
<br />Llmversity,:$an. arcbs, TX; :
<br />variety of projects. Additionally, he has considerable experience
<br />2601::.
<br />researching boundary and chain of title information and preparing
<br />Registrations -
<br />legal descriptions, Lot Line Adjustments, Voluntary Mergers, and
<br />Corner Records. Mr. Cullison has comprehensive knowledge in
<br />Professional,Land;SurveYor;.
<br />the use of Robotic Total Stations, GPS Surveying equipment, Data
<br />.>
<br />California, No 88 I. Year -2060;
<br />Collectors, AutoCAD Civil 3D software, ArcGIS software, and Trimble
<br />Professional Affiliations;
<br />Business Center.
<br />Amerfcah 5ociety;of'*CivII ; :. 6
<br />Relevant Experience
<br />Engineers (ASCE)
<br />California Land.SLi' 6rs
<br />Camp Pendleton -Mary Fay Elementary School Boundary
<br />Lease, Naval Facilities Engineering Command (NAVFAC)
<br />Association (CLSA)
<br />Years of Experience
<br />SW, San Diego, CA. Project Surveyor. Mr. Cullison Is responsible
<br />for overseeing the field and office survey work needed to rewrite
<br />5 '
<br />the lease document legal descriptions for the Mary Fay Elementary
<br />School Boundaryand the De Luz Housing complex PPV boundary
<br />adjacent to the school site. Tetra Tech was hired to perform
<br />topographic and boundary surveys of the current lease areas and
<br />Infrastructure and to write new legal descriptions and exhibits that
<br />would not only correct overlaps in the existing documents but would
<br />respect and facilitate the future expansion plans at the Mary Fay
<br />Elementary School site.
<br />Records research and Mapping Services for Defense
<br />Fuel Supply Point, San Pedro to Pier 12, Naval Facilities
<br />Engineering Command (NAVFAC) SW, Long Beach, CA.
<br />Project Surveyor. Mr. Cullison is responsible for overseeing this
<br />complex project to understand the current state of ownership, as
<br />well as how that ownership was original acquired for approximately
<br />9 miles of government owned underground fuel lines. Research
<br />was performed in records with NAVFAC, DLA, GSA, BRAC, Port of
<br />-
<br />Los Angeles, Port of Long Beach, the City of Long Beach, the City
<br />of Los Angeles, and the County of Lost Angeles to acquire the
<br />various deeds, leases, licenses, and court actions that created the
<br />permissions, both fee and less than fee, that allow those gas lines
<br />to be placed in their current locations. Tetra Tech originally reviewed
<br />10's of thousands of pages of documents, maps and other records to
<br />determine applicability to the current pipeline alignment. Deliverables
<br />for this project included updated and organized Muniment Files and a
<br />Pipeline Mapping Exhibit (PME).
<br />Airfield Pavement Topographic Surveys, Naval Facilities
<br />Engineering Command (NAVFAC) SW, Various Locations,
<br />Project Surveyor. Mr. Cullison is responsible for overseeingthe
<br />coordination of the field and office survey work for this fast paced,
<br />data intensive product. NAVFAC Public Works Is tasked with
<br />managing the condition assessment of airfield pavement for all of
<br />25F-70
<br />
|