Laserfiche WebLink
CECIA Initial Study/Mitigated <br />Negative Declaration <br />and NEPA Categorical <br />Exclusion for Victor Valley <br />Transit Authority Transit <br />Administration, Operations, <br />and Maintenance Facility, <br />Hesperia, CA. Project manager <br />and author of an IS/MND and <br />CE for the construction and <br />operation of a WTA Transit <br />Administration, Operations, and <br />Maintenance Facility In Hesperia, <br />CA. The new facility would provide <br />administration, operations, <br />compressed natural gas (CNG) <br />and unleaded gasoline fueling, <br />and bus maintenance In one <br />location to meet the projected <br />growth in demand for bus <br />services. <br />Telegraph Road Corridor <br />Revitalization Project <br />Program EIR, Commerce, <br />CA. Primary author of a Program <br />EIR for the revitalization and <br />redevelopment of a 4 -mile area <br />along the Telegraph Road Corridor <br />(adjacent to the I-5 freeway) <br />with a variety of uses Including <br />commercial, retail, entertainment, <br />mixed-use, and car dealerships, <br />Arlington Heights Sports Park <br />(formerly Riverside Youth <br />Sports Complex), Riverside, <br />CA. Primary author of an MND for <br />the construction and operation <br />of a public park that will provide <br />a variety of uses including lighted <br />play fields, playgrounds, a multi- <br />purpose recreational trail, central <br />plaza, restrooms, concession <br />facility, picnic area, and parking, <br />Reviewed technical studies and <br />associated analysis to determine <br />how construction, operations, <br />and the overall park development <br />would affect the environment. <br />Hazel Street Improvement <br />Project Categorical <br />Exemption, La Habra, CA, <br />Helped author a Categorical <br />Exemption for the Hazel Street <br />Improvement project. The <br />proposed project consisted of the <br />alteration of Hazel Street from La <br />Habra Boulevard to First Avenue <br />for southbound one-way operation, <br />and included landscaping, <br />landscaped concrete Islands, <br />irrigation, intersection treatment, <br />angled parking, signing, striping, <br />and other work as necessary. <br />Peer Review, Draft <br />Environmental Impact <br />Statement, Honolulu High - <br />Capacity Transit Project, <br />Honolulu, HI. The proposed <br />project was a 20 -mile elevated <br />light-rail line that will connect West <br />Oahu with downtown Honolulu <br />and Ala Moana Center. On behalf <br />of the client, a significant land <br />owner in Hawall, a technical <br />team conducted a peer review <br />of the Draft Environmental <br />Impact Statement which had <br />already been prepared for the <br />proposed Honolulu High -Capacity <br />Transit Corridor rail project. Their <br />review was in response to client <br />concerns over the potential loss of <br />properties which could be taken <br />for the project and the potential <br />Impacts on more than 100 <br />properties owned by the client, as <br />well as tenants, and businesses <br />occupying those properties <br />along the proposed train route. <br />Conducted the peer review of the <br />aesthetics section for the Honolulu <br />High -Capacity Transit Project. <br />Venoco Platform Holly <br />Power Cable Replacement <br />Project IS/MND, State Lands <br />Commission, Goleta, CA. Lead <br />author of an IS/MND for a power <br />cable replacement project that <br />would be located underground <br />and underwater. The proposed <br />project would replace the existing <br />46 year old sub -sea power cable <br />between the existing Ellwood <br />Onshore Facility and Platform <br />Holly. Onshore and through the <br />beach and surf zone, the cable <br />would be laid utilizing horizontal <br />directional drilling. Potential <br />impacts were assessed and <br />mitigated when warranted. The <br />project was located in Goleta, CA <br />and the Pacific Ocean and had an <br />expedited schedule. <br />Target Retail Store EIR, San <br />Clemente, CA - Conducted an <br />aesthetics study and alternatives <br />analysis for the Target Retail Store <br />EIR. The proposed project would <br />develop a 14.79 acre vacant <br />parcel into a 142,000 -square - <br />foot Target retail store with 513 <br />on-site parking spaces. Aesthetics <br />was of particular concern to City <br />residents in the vicinity of the <br />project site. <br />Proposed Expansion <br />of Thurgood Marshall <br />Elementary School MND, <br />Oxnard, CA. Primary author of <br />an MND for a new 12 -classroom <br />building on the existing Marshall <br />Elementary School Site. As <br />part of the project, the existing <br />school would be reconfigured to <br />Include grades 6th through 8th <br />thereby accommodating students <br />in grades K-8 at the Marshall <br />School campus. The proposed <br />12 -classroom permanent <br />structure would Increase student <br />capacity at the Marshall School <br />to 900 students at State loading <br />standards, satisfying the District's <br />educational specification for a K-8 <br />25F-75 <br />