Laserfiche WebLink
< z N AiIOUL EXHIBIT A <br />National Corrosion <br />CORROSION www.notional-corrosion.com <br />• Insulator potentials and AC potential <br />• Water depth <br />• Photographs with info <br />• Sub -meter GPS coordinates <br />• Corrosion Severity Code (Define and classify priority actions) <br />o Perform atmospheric assessments at key locations <br />o Conduct current requirement testing to verify current needed to bring pipe -to - <br />soil potentials up to MACE criteria. <br />c Create a scope of work for improvements or repairs required to Improve <br />corrosion assessment. <br />o Verifythe existence and location of stray DC currents affecting the pipelines at <br />locations near foreign impressed current cathodic protection systems. <br />o Test and verify dielectric isolation from foreign structures. <br />o All data to be ARCGIS compatible <br />o Create coating specifications and repair procedures <br />Task 3 — Integrate testing data into ArcGIS system <br />Field testing data will be recorded in a format compatible with ARCGIS. If ARCGIS <br />implementation is approved, then all data will be uploaded to a server. All activity will actively <br />update during repairs or modifications and the condition of facilities can be monitored <br />remotely. <br />• ARCGIS data will be recorded in a method that will aid estimation of coating and <br />mechanical repairs. <br />• All locations for repair will be prioritized and backed up with data <br />Task 4 — Corrosion Report (Deliverable) <br />After all field testing, inspection, and analysis is complete, a drafted report will be prepared <br />including the following: <br />• Description of testing procedures and tabulation of data <br />• Summary of test points showing GIS Coordinates along with identification <br />• Site photos <br />• Evaluation and assessment of active corrosion, status, and operational condition. <br />• Conclusions on as -found conditions <br />• Calculation of remaining life expectancy <br />• Prioritized recommendations of repairs or replacements. <br />• System operation and maintenance procedures <br />• Corrosion control plan to address immediate and long-term requirements <br />• Prepare a list of other cathodic protection systems owned by others that may cause <br />interference or require a coordination of efforts. <br />• Prepare cost estimates for recommendations and remediations <br />A rough draft report will be submitted to allow for comments and recommendations. A final <br />draft will be submitted in both electronic and hard copy format. <br />