My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NINYO & MOORE
Clerk
>
Contracts / Agreements
>
N
>
NINYO & MOORE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 11:25:27 AM
Creation date
10/4/2018 12:29:24 PM
Metadata
Fields
Template:
Contracts
Company Name
NINYO & MOORE
Contract #
A-2018-189
Agency
PUBLIC WORKS
Council Approval Date
8/21/2018
Expiration Date
8/20/2021
Insurance Exp Date
5/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual <br />EXAIBYF 10-II2 COST PROPOSAL PACaki 4 OF 5 <br />Exhibit 10-H <br />Cost Proposal <br />Al - Environmental Site Assessment <br />August 2018 <br />Effective <br />pates: Sei2ternber <br />OTHER DIRECT <br />2018 through August 2021 <br />Charge <br />Price/Unit <br />Charge <br />I <br />Price Unit <br />Aquifer Testing <br />Groundwater Monitoring <br />Grundfas Redlflow 2" Pump w controller <br />$ <br />110 day <br />Groundwater Equipment <br />$ <br />355 <br />day <br />3.30 gam O rRal Flow Meter/Totalizer <br />$ <br />230 day <br />Solinst 150' Elec. Water Level Meter <br />$ <br />30 <br />day <br />Level Logger (water column) <br />$ <br />70 day <br />Oil/Water interface Probe <br />$ <br />75 <br />day <br />Pressure Transducer <br />$ <br />65 day <br />Low Few Pump <br />$ <br />60 <br />day <br />LeveiTroii Trans/data loggers <br />$ <br />260 week <br />Controller MPSO <br />$ <br />115 <br />day <br />Barometric Data Logger <br />$ <br />105 week <br />Marine Battery <br />$ <br />18 <br />day <br />Drilling/Excavation%Soil Sampling <br />1X' X 1/4" banded tubing <br />$ <br />0.60 <br />fact <br />Purchased Raid Consumables <br />$ <br />100 day <br />pH/fond/Temp Meter <br />$ <br />25 <br />day <br />Encore Samples (EPA Method 5035) <br />$ <br />32 per test <br />Turbidity Meter <br />$ <br />30 <br />day <br />Quick Syringe Samples (EPA Method 5035) <br />$ <br />18 per test <br />Rapid Reel Manual Bailing Winch <br />$ <br />115 <br />day <br />U/G pipe and cable locator <br />$ <br />29 day <br />PVC 1-3/8" Bailer <br />$ <br />18 <br />day <br />PID Usage <br />$ <br />140 day <br />Dls. Water Sample Bailers Weighted 1.6" <br />$ <br />6 <br />each <br />PID Usage <br />$ <br />420 week <br />Disposable VOC Bailer Tips (1.6") <br />$ <br />1.50 <br />each <br />PIP Usage <br />$ <br />1,260 month <br />Disposable 0.45 Micron Filter <br />$ <br />20 <br />each <br />FID Usage <br />$ <br />140 day <br />Nylon String <br />$ <br />8 <br />roil <br />FID Usage <br />$ <br />420 week <br />Drum Doily <br />$ <br />18 <br />day <br />PID Usage <br />$ <br />1,260 month <br />DOT 17H 55 -gal Water Drams <br />$ <br />75 <br />each <br />,Gas Meter Usage <br />$ <br />140 day <br />3/8" Ploy Tubing <br />$ <br />0,50 foot <br />4 -Gas Meter Usage <br />$ <br />420 week <br />Peristaltic Pump/MlcroPurge Pump <br />$ <br />30 <br />day <br />4 -Gas Meter Usage <br />$ <br />1,260 month <br />Polyethylene check valves <br />S <br />15 <br />each <br />Weather Station <br />$ <br />75 day <br />Hazardous Building Material Survey <br />Weather Station <br />$ <br />225 week <br />HEMS Sampling Equipment <br />$ <br />25 <br />day <br />Weather Station <br />$ <br />675 month <br />Air Sampling Equipment <br />$ <br />50 <br />day <br />Dust Mnnitor(personal hand held) <br />$ <br />100 day <br />XRF Analyzer Usage <br />$ <br />300 <br />day <br />Dust Monitor (personal hand held) <br />$ <br />300 week <br />XRF Analyzer Usage <br />$ <br />1,200 <br />week <br />Dust Monitor (personal hand held) <br />$ <br />900 month <br />XRF Analyzer Usage <br />$ <br />3,600 <br />month <br />GPS Unit <br />$ <br />250 day <br />Delmhurst Moisture Meter <br />S <br />35 <br />day <br />GPS Unit <br />$ <br />750 week <br />Level C Personal Protective Equipment <br />$ <br />25 <br />person -day <br />GPS Unit <br />$ <br />2,250 month <br />Level D Personal Protective Equipment <br />$ <br />10 <br />persan-day <br />Vapor Extraction Testing <br />Manual Soil Vapor Survey <br />Vapor Boz <br />$ <br />30 day <br />lack Hammer(Rowhammeh <br />$ <br />60 <br />day <br />Tedlar Bags <br />$ <br />28 each <br />Nylaflow tubing 0,19' to 1/4 OD <br />$ <br />0.50 <br />foot <br />Summa Regulator <br />$ <br />75 each <br />Disposable Tip <br />$ <br />15 <br />each <br />Summa Canister <br />$ <br />125 <br />each <br />NOTE: <br />Other equipment and supplies, and subcontracted services (including analytical laboratory services) will be Invoiced at cast plus 10% <br />Al - Environmental Site Assessment <br />August 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.