Laserfiche WebLink
WINDOW BOARDING SPECIFICATION <br />i/2"CDXPLYWOOD <br />CUT <br />------------------------ <br />a -_L _r / WIND O TO COVER WINDOW OPENING <br />I SECURE TO STRUCTURE <br />Jr G <br />WITH 1.518"(6D) <br />1 GALVANIZED NAILS <br />f, L <br />2 X 4 BRACE «r <br />I CUT TO OUTSIDE <br />DIMENSION OF <br />H WINDOW TRIM <br />1 <br />i <br />2 X 4 BRACE <br />H CUT TO SIZE OF <br />H PLYWOOD <br />i <br />8 <br />H / <br />3 <br />8 <br />I <br />8 <br />i <br />\\3 <br />}� 318" CARRIAGE BOLT --f <br />i 12"LONG/COURSE THREAD <br />.,w -w«-"«"""`"'"""""""""'""" NUT TO MATCH. WASHERS INSTALLED <br />ON BOTH SIDES - <br />WINDOW -OUTSIDE VIEW ROUNDED HEAD OF BOLT ON OUTSIDE <br />NOTES: <br />I. FOR DOUBLE HUNG WINDOWS, SLIDE SASH TO CENTER OF UNIT AND PASS BOLTS <br />THROUGH OPENINGS AT TOP AND BOTTOM. <br />2, STORM WINDOWS SHOULD BE REMOVED AND STORED INSIDE STRUCTURE, <br />3. OUTSIDE TRIM MAY HAVE TO BE REMOVED TO ACCOMMODATE A FLUSH AND <br />TIGHT FIT, <br />4. TIGHTEN NUTS FROM INSIDE ENOUGH TO SLIGHTLY COMPRESS 2X4 BRACE. <br />S. BRACE LOCATIONS: A = 1/3 B (SEE DIMENSION LOCATIONS ON DRAWING) <br />NOTE: WINDOWS 3 FEET IN HEIGHT OR SHORTER ONLY REQUIRE ONE <br />BRACE. <br />6. LOCATION OF BOLT HOLES: C = 1/31) (SEE DIMENSION LOCATIONS ON DRAWING) <br />7. THE PLYWOOD BOARD SHOULD BE SECURED WITH SCREWS EVERY 12" ALONG <br />THE PERIMETER OF THE FRAME OF THE WINDOW, DOOR, OR OPENING, AND WITH <br />DECK NAILS AT EVERY 6" MARK WHERE SCREW IS NOT PLACED. <br />DOOR BOARDING SPECIFICATIONS <br />City of Santa Ana RFP 18-071 <br />Page 12 <br />