My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KMEA
Clerk
>
Contracts / Agreements
>
K
>
KMEA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:45:07 PM
Creation date
10/8/2018 1:58:05 PM
Metadata
Fields
Template:
Contracts
Company Name
KMEA
Contract #
A-2018-190
Agency
PUBLIC WORKS
Council Approval Date
8/21/2018
Expiration Date
8/20/2021
Insurance Exp Date
5/19/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE OF OTHER DIRECT COST ITEMS <br />Description of item <br />Quantity <br />Unit <br />Unit Cost <br />Total <br />Mileage Costs <br />TBD <br />TBD <br />TBD <br />TED <br />Equipment Rental and Supplies <br />TBD <br />TBD <br />TBD <br />TBD <br />Permit Fees <br />TBD <br />TBD <br />TBD <br />TBD <br />Plan Sheets <br />TBD <br />TBD <br />TBD <br />TBD <br />Test <br />TBD <br />TBD <br />TBD <br />TBD <br />Vehicle <br />TBD <br />TBD <br />TBD <br />TBD <br />Subconsultant 1: <br />TED <br />Subconsultant 2: <br />TBD <br />Subconsultant 3: <br />TBD <br />Subconsultant 4: <br />TBD <br />Subconsultant 5: <br />TBD <br />Brass er Stainless Steel Liners 2.0" x 6,0" <br />TBD <br />Each <br />$ 6.00 <br />TBD <br />Teflon Squares for Sample Liners <br />TBD <br />Each <br />$ 1.00 <br />TBD <br />Basket Retainers for loose soil sampling <br />TBD <br />Each <br />$ 10.00 <br />TBD <br />Install 6" Monument Casing <br />TBD <br />Each <br />$ 550.00 <br />_ <br />TBD <br />Install 8" Monument Casing <br />TED <br />Each <br />$ 750.00 <br />TBD <br />Removal of 8" Traffic Rated Well Boxes <br />TBD <br />Each <br />$ 75.00 <br />TBD <br />Removal of 12" Traffic Rated Well Boxes <br />TBD <br />Each <br />$ 125.00 <br />TBD <br />Collect H dro unch Water Sample (HSA) <br />TBD <br />Each <br />$ 250.00 <br />TBD <br />Collect Hydropunch Water Sample (Geoprol <br />TBD <br />Each <br />1 $ 50,00 <br />TBD <br />Delivery of additional materials or e(quipma <br />TBD <br />Lump and u) <br />$ 200.00 <br />TBD <br />Bentonite Chips <br />TBD <br />bags <br />$ 18.00 <br />TBD <br />Mobilization/Demobilizationof Forklift <br />TED <br />Lum <br />$ 250.00 <br />TBD <br />Forklift & Hopper Rental <br />TBD <br />Da and up) <br />$ 350.00 <br />TBD <br />For Coring Crew <br />TBD <br />Each <br />$ 135.00 <br />TBD <br />Surface Core 4" - 6" thick 4" diameter <br />TBD <br />Each <br />$ 50.00 <br />TBD <br />Saw Cut 12" x 12" Square <br />TBD <br />Each <br />$ 95.00 <br />TBD <br />Saw Cut 24" x 24" Square <br />TBD <br />Each <br />$ 125.00 <br />TBD <br />Asphalt pjWh <br />TBD <br />perborehote <br />1 $ 15.00 <br />TBD <br />Concrete patch <br />TBD <br />perborehole <br />$ 25.00 <br />TBD <br />Ra id Set Concrete Patch <br />TBD <br />per borehole <br />$ 50.00 <br />TED <br />Concrete Cuts <br />TBD <br />per cut and up <br />$ 75.00 <br />TED <br />55 Gallon Drums <br />TBD <br />per drum <br />$ 50.00 <br />TBD <br />Additional material cost for bentonite grout <br />TBD <br />per foot <br />$ 6.00 <br />TED <br />Backfill borings with bentonite chips <br />TBD <br />per foot <br />$ 10.00 <br />TBD <br />Collect water sample thru augers <br />TBD <br />per sample <br />$ 150.00 <br />TBD <br />Steam Cleaner Onsite <br />TBD <br />per da <br />$ 250.00 <br />TBD <br />Service Truck <br />TBD <br />per day (and u <br />$ 250.00 <br />TBD <br />Generator Rental <br />TBD <br />per day and u <br />$ 150.00 <br />TBD <br />Pressure Washer Rental <br />TBD <br />per day <br />$ 250.00 <br />TBD <br />Night Lights <br />TBD <br />per night (and <br />$ 500.00 <br />TBD <br />Peristaltic Pump <br />'TBD <br />per day (and u <br />$ 50.00 <br />TED <br />Peristaltic tubing <br />TBD <br />per foot <br />$ 1.00 <br />TBD <br />Night Lights <br />TBD <br />per night (and i <br />$ 500.00 <br />TBD <br />Boost Ali, Compressor <br />TBD <br />per day (and u <br />$ 2,000.00 <br />TBD <br />Inclinometer Casing 2.75") <br />TBD <br />per foot <br />$ 15.00 <br />TBD <br />Inclinometer Anchor <br />TBD <br />Each <br />$ 250,00 <br />TBD <br />Per diem 1-matt crew) <br />TBD <br />per day <br />$ 150,00 <br />TBD <br />Per diem 2-man crew) <br />TBD <br />per day <br />$ 300,00 <br />TBD <br />Per diem 3-man crew) <br />TBD <br />per day <br />$ 450,00 <br />TBD <br />Orange Fencin <br />TBD <br />per day <br />from $250 <br />TBD <br />Health & Safet Plan <br />TBD <br />perjob <br />from $150 <br />TBD <br />Traffic Control <br />TBD <br />perday <br />from $800 <br />TBD <br />Level B & C <br />TBD <br />per day <br />fiom $500'TBD <br />Blower Fans <br />TBD <br />per day <br />from $250 <br />TBD <br />Night Lights <br />TBD <br />per night <br />from $500 <br />TBD <br />
The URL can be used to link to this page
Your browser does not support the video tag.