My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NINYO & MOORE (3)
Clerk
>
Contracts / Agreements
>
N
>
NINYO & MOORE (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 11:27:56 AM
Creation date
10/8/2018 2:36:06 PM
Metadata
Fields
Template:
Contracts
Company Name
NINYO & MOORE
Contract #
A-2018-191
Agency
PUBLIC WORKS
Council Approval Date
8/21/2018
Expiration Date
8/20/2021
Insurance Exp Date
5/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP No. 18-043 A2— Hazardour, Materials Survoys <br />b. Contract Agreement Statement <br />Ninyo & Moore concurs with all provisions as contained in Attachment 2 Standard Agreement of the <br />Request for Proposal (RFP). <br />c, Firm and Team Experience <br />Ninyo & Moore is a California corporation that was established in 1986 to provide exceptional <br />environmental engineering and consulting, geotechnical engineering, geologic, hydrogeologic, soil <br />and materials testing, and special Inspection consulting services to the public and private sectors. <br />Ninyo & Moore has drawn from its staff of over 400 professionals to bring the City of Santa Ana Public <br />Works Agency (City) a well-qualified team of hazardous material professionals including Certified <br />Industrial Hygienists (CIH), California Division of Occupational Safety and Health (DOSH) Certified <br />Asbestos Consultants (CACs), DOSH Site Surveillance Technicians (CSSTs), California Department <br />of Health (CDPH) Lead Related Construction (LRC) Inspector/Assessors (I/As) and Project Monitors <br />(PMs), and senior management personnel skilled in environmental assessment and engineering <br />consulting services. All of our proposed project personnel are experienced environmental <br />professionals and are highly skilled in performing their specific area of expertise. Our key technical <br />and field personnel will provide the scope of services presented in the RFP from our office in Irvine, <br />California. The project team possesses working knowledge of and experience with the required <br />documents and standards, and maintains professional relationships with local regulatory agency <br />personnel. Ninyo & Moore project personnel will perform work under the direct -supervision of the <br />appropriated licensed professionals on the team. Our team is fully available for, and committed to <br />providing, the necessary resources for successful execution of the services requested in the City's <br />RFP. <br />Ninyo & Moore hazardous material professionals work together to perform asbestos and lead-based <br />paint surveys, abatement monitoring, and abatement project management regularly for a wide varie- <br />ty of clients. We are highly experienced in assisting our clients to be in compliance with various local, <br />state, and federal regulatory requirements working within the framework of DOSH, the United States <br />Environmental Protection Agency (EPA), the local South Coast Air Quality Management District <br />(SCAQMD), the California Department of Health, and the Housing and Urban Development (HUD) <br />guidelines. <br />Ninyo & Moore maintains its exceptional reputation in the industry by providing high quality technical <br />expertise while meeting difficult work schedules and budgetary goals. This is made possible through <br />our methodical project management approach and our ability to effectively use senior personnel for <br />project management guidance. We propose the following key personnel to provide the hazardous <br />material consulting services required by this contract. These and other Ninyo & Moore staff mem- <br />bers are dedicated to the success of the City's projects, and are available as -needed to fulfill the <br />City's requirements. <br />The Ninyo & Moore project team, lines of authority, communication, and responsibilities within the <br />project team are summarized on our Organization Chart shown below. Complete resumes of Ninyo <br />& Moore key personnel are provided in Appendix A of this submittal. <br />Ninyo & Moore I City of Santa Ana - (A2) Hazardous Material Su),veys 105-00713 A2 I June 5, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.