Anthony I Lizzi, PC, CMCJ
<br />Contract Manager
<br />EDUCATION
<br />MS, Geology (Hydrogeology), 2007,
<br />California State University, Fullerton
<br />BS, Geology, 1986, Concordia Univer-
<br />sity
<br />Pure and Applied Sciences, 1984,
<br />Vanier College
<br />PG 7328 (California)
<br />GHG799 (California)
<br />Hazardous Materials Management
<br />OSHA44-hour Hazardous Waste
<br />Operations and Emergency Response
<br />(HAZWOPER) with annual 8 -hour
<br />refreshers
<br />OSHA 8 -hour HAZWOPER Site
<br />Supervisor Training
<br />SARA Title Ill Experience
<br />Confined Space Entry Training
<br />National Groundwater Association
<br />Mr. Anthony Lizzi is a Principal Geologist and a registered geologist and certified
<br />hydrogeologist with a professional career that spans more than 28 years In the areas
<br />of site assessment and remediation and groundwater resource analysis. He is an
<br />experienced geologist specializing in conducting soil and groundwater investigations
<br />of complex sites Impacted by soil, soil gas and groundwater contamination, imple-
<br />menting soil and groundwater remediation, preparation and implementation of soil
<br />removal/remedial action, and groundwater resource analysis, Mr. Lizzi is responsible
<br />for senior technical review of all environmental sok and groundwater documents. As
<br />a program manager, he is also experienced in interacting with regulatory agencies
<br />(city, county, state agencies (SWRC8 and DTSCj) on behalf of clients to assist the
<br />agencies to understand the type of Impact, and full extent of the contaminant release
<br />to expedite the approval of remedial plans, cleanup process and obtain a no further
<br />action letter,
<br />City of Irvine, fin -Cali Services for the orange County Great lark, Irvine; Cali-
<br />fornia: Technical Advisor for this on-call environmental support contract. The former
<br />Marine Corps Air Station EI Toro Is being transformed into the Orange County Great
<br />Park. A project area spanning approximately 4,604 acres, wif) more than 244 acres
<br />developed and 688 acres in planning and design and fully funded, the Great Park
<br />master plan Includes recreation; competitive sports facilities and parkland; preserves
<br />the environment and Orange County's agricultural heritage; and honors the military
<br />history of the former air Base, To date services have included the oversight of remov-
<br />al of non -recyclable, non -hazardous, and hazardous materials encountered during
<br />demolition and grading, identification of hazardous materials used in the construction
<br />of buildings such as asbestos, PCBs, and lead-based paint, small scale removal and/
<br />or abatement of asbestos -containing materials and lead-based paint from structures
<br />scheduled for demolition or renovation, provided oversight during removal and dis-
<br />posal activities performed by the City's remediation contractor, performed confirma-
<br />tion sampling, and prepared closure reports,
<br />City of Brea, The Tracks at Brea, Brea, Californias Principal -In -Charge for this proj-
<br />ect which involved preparation of remedial action plans (RAPS) for two sites identified
<br />with shallow arsenic contamination along the approximately 3,5 -mile dual -tread pe-
<br />destrian and bicycle trail to be developed along arailroad corridor utilizing abandoned
<br />railroad rights-of-way and other properties. A Mitigated Negative Declaration and a
<br />Phase I and Phase It Environmental Site Assessments (ESAs) have been complet-
<br />ed for the sites, The RAPS were developed based on the results of Phase II ESAs
<br />performed, at the two sites, The RAPS included relevant figures and maps depicting
<br />the results of the Phase II ESAs and implementation of the selected remedial action,
<br />The RAPS were approved by the Orange County Health Care Agency (OCHCA) for
<br />implementation.
<br />City of Los Angeles Department of Recreation and Parks, tin -Gail Environmen-
<br />tal Consulting Services Contract Los Angeles, California: Principal Geologist for
<br />technical review of environmental documents including work plans and Phase 11 Em/1-
<br />ronmental Site Assessments (ESAs) for conducting environmental site assessments,
<br />Identification of hazardous building materials, and supervised the surface sampling
<br />Anthony J. Unf, PG, CHC, Contract Manager I Map &Moore I Geatecholcal & Environmental Sciences Consultants
<br />
|