Michael So Cushner, CAC, LRC N/A and PM
<br />Project Manager
<br />B,S„ Management, 1986, Widener
<br />University
<br />REGISTRATIONS/
<br />C:ERTIFICe1T' ONS
<br />CA/DOSH Certified Asbestos Consul-
<br />tant No, 11.4711
<br />CDPH Lead -Related Construction
<br />Inspector/Assessor No. 18953
<br />CDPH Lead -Related Construction
<br />Project Monitor No. 16953
<br />NIOSH 582 Equivalency Course
<br />Mold w Indoor Air Quality Course
<br />OSHA 40 -hour HAZWOPER
<br />w! annual 8 -hour refreshers
<br />OSHA 8 -hour HAZWOPER Site Su-
<br />pervisor Training
<br />Mr. Michael CUshnerIsA Senior Project Environmental Scientist and Is responsible
<br />for the project coordination and technical thoroughness of our local Environmental
<br />Division's asbestos and lead inspection surveys, abatement monitoring oversight,
<br />mold and moisture evaluations, and other hazardous materials surveys, He directs
<br />these projects, including supporting Cities, large construction projects, highway
<br />improvements, commercial and industrial buildings, K-12 school districts, and
<br />community college districts. In addition to leading a team of Industrial hygienists,
<br />Mr, Cushner reviews technical reports, provides hazardous building material
<br />abatement recommendations, prepares abatement bidding and work plan
<br />specification documents, assists clients with contractor selection and pre-bid job
<br />walk support, and is the main client point of contact for this work.
<br />City of Santa Ana, YMCA Building Renovation Project, Santa Ana, California:
<br />Mr. Cushner performed project management from 2016 through 2017 on all aspects
<br />of the work related to the YMCA building renovation project. The 45,000 square
<br />foot structure has been vacant for over a decade, An initial hazardous building
<br />material survey was performed for the structure, which is considered a historic
<br />landmark. Findings included damaged asbestos, lead palm,..unlversal wastes,
<br />and biological waste contamination, Completed tasks included providing a current
<br />hazardous building material survey and report, preparation of abatement bidding
<br />specification documents, preparation of an estimated cost of abatement document,
<br />assisted the City of Santa Ana with hosting a job walk for the needed abatement,
<br />preparation of a South Coast Air quality management district procedure 5 plan,
<br />provided abatement monitoring and clearance services over a 4 -month duration,
<br />and preparation of an abatement closeout report.
<br />City of Temple City, Various Projects, Temple City, California: As Project
<br />Manager, directed hazardous building material surveys for upcoming demolition
<br />of a previous mortuary and four apartment buildings as the city was planning
<br />to purchase these properties. Asbestos end lead surveys were performed,
<br />including developing an inventory of universal waste materials. Abatement
<br />bidding specifications were prepared for the mortuary, Including supporting the
<br />City with a pre-bid job walk for abatement and demolition contractors. Abatement
<br />monitoring services were performed for the mortuary, including closeout report
<br />documentation. Abatement monitoring services for the four apartment buildings is
<br />planned for Summer, 2018,
<br />City of Irvine, Orange CountyGreat Park, Irvine, California: As Project Manager,
<br />directed hazardous building material surveys and abatement monitoring services
<br />of various commercial structures In support property redevelopment. The surveys
<br />were performed, including developing an inventory of universal waste materials. In
<br />addition, specific abatement plans were prepared for the City in order to address
<br />sub -surface asbestos piping abatement. A Procedure 5 Plan was prepared in
<br />accordance with the local South Coast Air Quality Management District Rule 1403
<br />requirements, Abatement monitoring and clearance services was performed, for
<br />all hazardous materials documented to be present from our surveys, and closeout
<br />report preparation for each structure or sub -surface abatement location,
<br />Michael e, Gusher, CAC, LNG UA and PM, Project Manager I Ninyo & Moore I Geotechnical & Environmental Sciences Consultants