ELECTRICAL/LIGH-fING- IRVINE, CA,
<br />Mr. Mazen Kassar has more then 25 years of experience In electrical
<br />engineering and industry standard that include electrical engineering
<br />Education
<br />staff management, project management, construction management
<br />BS; Electrical Engineering;
<br />and supervision, water and wastewater treatment, petro-chemloal
<br />California State.Unlversity,
<br />design, and environmental soil and groundwater treatment. His
<br />Long Beach, 1.990
<br />background Includes designing medium and low voltage power
<br />Ragstratiohs
<br />distribution, designing instrumentation, control systems and
<br />SCADA systems for a wide -variety of projects, and the installation
<br />Professional Electrical
<br />of electrical systems for remediation projects, including soil vapor
<br />Engineer, California, No.
<br />extraction systems and groundwater pump -and -treat systems. Other
<br />1.5809, 7 998
<br />experience Includes, working with utility companies to provide new
<br />General Construction, Class'B
<br />electrical service to new projects, working with local Building and
<br />No. 777645 California; 2008
<br />Safety Departments to obtain Plan Check and construction permits,
<br />Contractor - G10 Electrical,
<br />field troubleshooting of electrical and mechanical systems, system
<br />California Class C — Specialty,
<br />11,
<br />commissioning and startup, problem solving, and managing an
<br />.
<br />No,.jj7845, 2000
<br />operation and maintenance department. He has strong knowledge In
<br />.
<br />M$ Office and AutoCAD.
<br />ETAP Electrical Power
<br />Modeling; 2010r
<br />Relevant Experience
<br />Project Management I & 11,
<br />SJVWB-ERRP Phase 1 Well E Upping and Treatment
<br />Facilities Preliminary Design, astern Municpal Water
<br />2012
<br />Auto CAD, 2005
<br />District, San Jacinto, CA, Supervising the electrical design
<br />GE andAllen Bradley PLC
<br />for a project that Includes preparation of a Preliminary Design
<br />programmmg,'2b04
<br />Report with an evaluation of the pipeline corridors from four wells
<br />GE/Inteliution and
<br />to a central treatment plant, review of treatment technology for
<br />Wonerware SCADA
<br />S998
<br />Iron and manganogo removal,. disinfection using chloramines,
<br />booster pump station and reservoir and well equipping evaluation.
<br />pronderwlire
<br />Preliminary design drawings will be prepared to a 80% design level
<br />Vapor a\extraction and
<br />that addresses the civil site, mechanical, process, electrical and
<br />GroundwaterTreatment,
<br />Instrumentation components of the treatment and blending facility,
<br />OSHA 8-hour Hazardous
<br />site work and pipeline plan and profile sheets. Project field work will
<br />Waste OperationsAnnuai
<br />consist of a geotechnical investigation of the well sites, treatment
<br />Refresher Training, 2016 -.
<br />plant and pipeline corridors, aerial and ground survey, potholing and
<br />OSHA 8 hour Hazardous
<br />corro-sion analysis.
<br />WasteP;O erations Site
<br />I Wel 21 &22 Desaltar Plant, Irvine Ranch Water District,
<br />SupennsorTraintng,1992
<br />Irvine, CA. Wells 21 and 22 Reverse Osmosis (RO)Treatment
<br />Plant is designed to remove solids from well water and provide
<br />OSHR40 hour Hazardous t
<br />potable water source. The design consisted of providing all design-
<br />a§t
<br />NWaste Operatiori5 Training,
<br />build services to construct a fully operational reverse osmosis
<br />water treatment plant including, but not limited to: Pretreatment
<br />Professional Affiliations
<br />chemical systems, high pressure feed pumps, reverse osmosis
<br />`Institute of Electrical and
<br />treatment trains, membrane clean -In -place system, decarbonators,
<br />Electronics Engineers IEEE
<br />post treatment chemical systems, supervisory control and data
<br />acquisition, product water pump station, treatment plant building
<br />years of Experience
<br />and electrical arid instrumentation system. The RO Plant was sized
<br />25 '
<br />to produce 6,27 mgd of water. Water will be treated to remove salts
<br />(TDS) and nitrates, Managed the electrical design of the electrical
<br />power and control system, preparing technical specifications,