Laserfiche WebLink
ELECTRICAL/LIGH-fING- IRVINE, CA, <br />Mr. Mazen Kassar has more then 25 years of experience In electrical <br />engineering and industry standard that include electrical engineering <br />Education <br />staff management, project management, construction management <br />BS; Electrical Engineering; <br />and supervision, water and wastewater treatment, petro-chemloal <br />California State.Unlversity, <br />design, and environmental soil and groundwater treatment. His <br />Long Beach, 1.990 <br />background Includes designing medium and low voltage power <br />Ragstratiohs <br />distribution, designing instrumentation, control systems and <br />SCADA systems for a wide -variety of projects, and the installation <br />Professional Electrical <br />of electrical systems for remediation projects, including soil vapor <br />Engineer, California, No. <br />extraction systems and groundwater pump -and -treat systems. Other <br />1.5809, 7 998 <br />experience Includes, working with utility companies to provide new <br />General Construction, Class'B <br />electrical service to new projects, working with local Building and <br />No. 777645 California; 2008 <br />Safety Departments to obtain Plan Check and construction permits, <br />Contractor - G10 Electrical, <br />field troubleshooting of electrical and mechanical systems, system <br />California Class C — Specialty, <br />11, <br />commissioning and startup, problem solving, and managing an <br />. <br />No,.jj7845, 2000 <br />operation and maintenance department. He has strong knowledge In <br />. <br />M$ Office and AutoCAD. <br />ETAP Electrical Power <br />Modeling; 2010r <br />Relevant Experience <br />Project Management I & 11, <br />SJVWB-ERRP Phase 1 Well E Upping and Treatment <br />Facilities Preliminary Design, astern Municpal Water <br />2012 <br />Auto CAD, 2005 <br />District, San Jacinto, CA, Supervising the electrical design <br />GE andAllen Bradley PLC <br />for a project that Includes preparation of a Preliminary Design <br />programmmg,'2b04 <br />Report with an evaluation of the pipeline corridors from four wells <br />GE/Inteliution and <br />to a central treatment plant, review of treatment technology for <br />Wonerware SCADA <br />S998 <br />Iron and manganogo removal,. disinfection using chloramines, <br />booster pump station and reservoir and well equipping evaluation. <br />pronderwlire <br />Preliminary design drawings will be prepared to a 80% design level <br />Vapor a\extraction and <br />that addresses the civil site, mechanical, process, electrical and <br />GroundwaterTreatment, <br />Instrumentation components of the treatment and blending facility, <br />OSHA 8-hour Hazardous <br />site work and pipeline plan and profile sheets. Project field work will <br />Waste OperationsAnnuai <br />consist of a geotechnical investigation of the well sites, treatment <br />Refresher Training, 2016 -. <br />plant and pipeline corridors, aerial and ground survey, potholing and <br />OSHA 8 hour Hazardous <br />corro-sion analysis. <br />WasteP;O erations Site <br />I Wel 21 &22 Desaltar Plant, Irvine Ranch Water District, <br />SupennsorTraintng,1992 <br />Irvine, CA. Wells 21 and 22 Reverse Osmosis (RO)Treatment <br />Plant is designed to remove solids from well water and provide <br />OSHR40 hour Hazardous t <br />potable water source. The design consisted of providing all design- <br />a§t <br />NWaste Operatiori5 Training, <br />build services to construct a fully operational reverse osmosis <br />water treatment plant including, but not limited to: Pretreatment <br />Professional Affiliations <br />chemical systems, high pressure feed pumps, reverse osmosis <br />`Institute of Electrical and <br />treatment trains, membrane clean -In -place system, decarbonators, <br />Electronics Engineers IEEE <br />post treatment chemical systems, supervisory control and data <br />acquisition, product water pump station, treatment plant building <br />years of Experience <br />and electrical arid instrumentation system. The RO Plant was sized <br />25 ' <br />to produce 6,27 mgd of water. Water will be treated to remove salts <br />(TDS) and nitrates, Managed the electrical design of the electrical <br />power and control system, preparing technical specifications, <br />