My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - LIGHTING ROSS ANNEX PARKING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
25D - AGMT - LIGHTING ROSS ANNEX PARKING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:18:03 PM
Creation date
11/15/2018 9:12:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25D
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8, Lighting Design <br />Ourcompany offers lighting design services forevery project. This step of the process is critical and <br />features the following; <br />• Our design team will thoroughly review the information collected by our auditor so that we can better <br />understand the existing lighting system, <br />• Upon review, we will prepare a proposal to provide the client with a detailed financial analysis and our <br />recommended LIED lighting & controls to be installed. <br />Our team will design one or more options based on the following general guide0nes and/or goals for <br />each facility; <br />o Match or improve current light quality and output <br />o Specify LED retrofit kits where possible and new LED fixtures when retrofit kits are not the <br />desired option. <br />o if operating hours are extremely low, or the fixture cannot economically be replaced with a new <br />fixture or retrofit kit, we will typically specify 'Type A° TLED lamps with new ballasts. <br />Our process includes design of the proper lighting controls <br />technology. This step is frequentlyoverlooked by many <br />competitors, but it has been shown that when properly designed <br />and Installed, lighting controls can reduce buildings' energy use <br />by an additional 24.38%. Our process Includes the use of <br />occupancy, daylight, and dimming controls when appropriate. <br />We have our own in-house CALTCP certified Acceptance <br />Technician to ensure that the system complles with state or <br />localenergy codes, <br />if customer has specific -Illumination standards that must be met, we have in-house ability todesign a <br />system based upon accurate photometric predictions for light levels. <br />o ERC's certified lighting designerufilizes AGI32 Lighting Software, the industrystandard for <br />accurately calculating both interior <br />and-extedoriightieveis, <br />o The customers existing lighting <br />fixture schedule along with CAD <br />drawings are collected, and the <br />Information is then input Into the <br />AGI32 software, The software <br />allows our designer to simulate the <br />new illumination levels with the <br />proposed LED fixture. <br />Our designer can then select the <br />appropriate LED fixture that <br />produces the Customer's required foot candle measurements, <br />• Value Engineering is a key componentof our process. We believe there Is always great opportunity In <br />the LED lighting to Identify materials and construction techniques to reduce project cost without <br />compromising the quality, -aesthetics, or reliability of the new LED system. Our design team works <br />ENFRGY REMUFrr CQ. <br />25D-66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.