My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - LIGHTING ROSS ANNEX PARKING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
25D - AGMT - LIGHTING ROSS ANNEX PARKING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:18:03 PM
Creation date
11/15/2018 9:12:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25D
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X. Project Case Studles <br />Poway Unified School District <br />37Y6 Annual Energy Savings <br />PROJECT DESCRIPTION <br />This project was installed for the Poway Unified School District in Poway, California from 2014.2016. ERC worked <br />as a subcontractor for Barnham Construction and together the companies won a bid RFP that was valued at $1.6M. <br />The project featured funding from California Prop 39, as well as significant rebates from SDG&E: <br />SCOPE OF WORK <br />Prooect Images <br />✓ Designed and Installed new LED lighting fortwo elementary and two high schools in the PUSD. <br />✓ The retrofit solution included the replacement of all HID and Fluorescent technology with LED. <br />✓ CREE LED troffer fixtures. CREE 81 -Level wall packs, LED Can retrofit kits, LED Type A Tubes with new <br />ballasts, and CREE Area Lights. <br />✓ Installation of low voltage 0.10V dimming controls in all classrooms and offices. <br />. _Overall redtictlon of 3i% Iq energy use... _ <br />✓ Overall project cost= $11.15M. <br />PROJECT CHALLENGES 8 SOLUTIONS <br />✓ The. District stated it was Important that the now dimming controls teohnology.be easy to use by the school <br />room teachers and the school staff. <br />✓ Our Team designed a Lighting Controls Solution that Included occupancy sensors, controls, and dimming <br />technology that were easy to use by the staff. ERC offered a.commissioning process which featured both <br />training for the staff as well as system Setup In each room. <br />✓ Low Voltage 0.10V dimming controls were designed to ensure that dimming circuit #1.controlled the two <br />fixtures directly in front of the classroom projector screen, whereas the balance of the futures in the <br />classroom were controlled by dimming circuit #2. <br />.r. <br />T ENERGY REMOFM Cm. <br />v�.:na.�swmv� <br />25D-72 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.