My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - LIGHTING ROSS ANNEX PARKING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
25D - AGMT - LIGHTING ROSS ANNEX PARKING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:18:03 PM
Creation date
11/15/2018 9:12:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25D
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anaheim Convention Center <br />$360,347Annuai Energy Savings <br />PROJECT DESCRIPTION <br />Anaheim Convention center awarded Energy Retrofit Co. a contract toseplace their outdated T12 Fluorescent HO <br />fixtures. After the initial contract was completed, the facilities staff requested ERC to design -build additional work to <br />complete the exterior lighting, office lighting, andparking garage lighting. The additional lighting work was done as e <br />"change order" to the Initlai contract and was paid for using a combination of U.S, Department of Energy's Energy <br />Efficiency and Conservation Block Grant.(EECBG) Program and Anaheim Utility Rebates. <br />Protect images <br />SCOPE OF WORK <br />✓ Replaced over 2000 T12 fluorescent fixtures with new low wattage fixtures with bl-level occupancy controls <br />In the parking garage. <br />✓ Retrofitted all interior office lighting and all common areas with new tow watta9e system. <br />✓ Energy savings exceeded, $360K per year. <br />✓ Overall project cost = $785K, <br />PROJECT CHALLENGES & SOLUTIONS <br />The cofiVention center and parking garege were extremely busy— operating 24 hours per day, everyday of <br />the year, with no down time for an installation to be scheduled. <br />✓ The ERC installation team worked closely with facilities management to coordinate product delivery and <br />Installation between convention. center event dates; <br />✓ The ERC Installation team worked double shifts to ensure that all 2,000+ convention center hall fixtures <br />were safely installed In under 45 days, with no Impact to the center's schedule of events. <br />ENERGY REfROST Cra. <br />25D-75 <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.