My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - TUSTIN AND 4TH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
75B - PH - TUSTIN AND 4TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:21:49 PM
Creation date
11/15/2018 9:19:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.0 SITE ACCESS AND INTERNAL CIRCULATION EVALUATION <br />9.1 Site Access <br />Vehicular access to the existing gas station at 325 N. Tustin Avenue is currently provided by one (1) <br />right in -right out driveway on Tustin Avenue and four (4) right in -right out driveways on Fourth <br />Street. Access to the existing restaurant at 301 N. Tustin Avenue is currently provided by one (1) full <br />access driveway and one (1) right in -right out driveway on Tustin Avenue. <br />Vehicular access will remain generally similar to the current driveways with the exception of the <br />removal of the one (1) right in -right out driveway at the existing restaurant along Tustin Avenue and <br />the westerley right in -right out driveway along Fourth Street. A total of three (3) driveways will <br />provide access to the proposed Project site. <br />Table 9-1 summarizes the intersection level of service results for the three (3) proposed Project <br />driveways under near-term (Year 2019) traffic conditions at completion and full occupancy of the <br />proposed Project. As shown, these key study intersections are forecast to operate at LOS C or better <br />during the AM peak hour and PM peak hour. <br />Appendix D presents the near-term HCM/LOS calculations for the three (3) Project driveways. <br />9.2 Internal Circulation Evaluation <br />The on-site circulation was evaluated in terms of vehicle -pedestrian conflicts. Based on our review <br />of the preliminary site plan, the overall layout does not create any unsafe vehicle -pedestrian conflict <br />points and the driveway throating is sufficient such that access to parking spaces is not impacted by <br />internal vehicle queuing/stacking. Curb return radii have been confirmed and are adequate for <br />service/delivery trucks and trash trucks. The on-site circulation is very good based on our review of <br />the proposed site plan, whereas the alignment, spacing, and throating of the Project driveways is <br />adequate. The circulation around the buildings is adequate with sufficient sight distance along the <br />drive aisles. <br />75B-108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.