My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - TUSTIN AND 4TH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
75B - PH - TUSTIN AND 4TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:21:49 PM
Creation date
11/15/2018 9:19:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12.3 Year 2019 Traffic Conditions — Caltrans Methodology <br />Table 12-3 summarizes the Year 2019 peak hour HCM level of service results at the two (2) state- <br />controlled study intersections within the study area. The first column (1) of HCM/LOS values in <br />Table 12-3 presents a summary of existing traffic conditions. The second column (2) presents Year <br />2019 cumulative traffic conditions based on existing intersection geometry, but without any project <br />generated traffic. The third column (3) presents future forecast traffic conditions with the addition of <br />Project traffic. Column four (4) indicates whether the traffic associated with the Project will have an <br />impact based on the LOS standards defined in this report. The fifth column (5) presents the resultant <br />level of service with the inclusion of recommended traffic improvements, where needed, to achieve <br />an acceptable level of service. <br />12.3.1 Year 2019 Cumulative Trak Conditions <br />An analysis of future (Year 2019) cumulative traffic conditions indicates that with the addition of <br />ambient traffic growth and related projects traffic, both state-controlled study intersections currently <br />operate an acceptable LOS C or better during the AM and PM peak hours. <br />12.3.2 Year 2019 Cumulative Plus Project Traffic Conditions <br />Review of columns (3) and (4) of Table 12-3 indicates that traffic associated with the proposed <br />Project will not significantly impact any of the two (2) state-controlled study intersections, when <br />compared to the LOS standards and significant impact criteria specified in this report. <br />Appendix E presents the Caltrans level of service calculation worksheets for the two (2) state- <br />controlled study intersections. <br />75B-115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.