My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - TUSTIN AND 4TH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
75B - PH - TUSTIN AND 4TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:21:49 PM
Creation date
11/15/2018 9:19:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13.0 ROADWAY SEGMENT EVALUATION <br />Per City of Santa Ana requirements, this section of the report analyzes the daily operating conditions <br />of the key roadway segment within the vicinity of the proposed Project. One (1) key roadway <br />segment within the City of Santa Ana has been selected for evaluation and is listed below: <br />A. Tustin Avenue, between Fourth Street and First Street (Santa Ana) <br />13.1 Roadway Link Capacities <br />Daily operating conditions for the one (1) key roadway segment (links) identified above have been <br />investigated according to the daily volume -to -capacity (V/C) of each link. The daily V/C <br />relationship is used to estimate the LOS of the roadway segment with the volume based on 24-hour <br />traffic count data and the capacity based on the Orange County Master Plan of Arterial Highways <br />(MPAH) street classifications. The daily and peak hour roadway link capacity of each street <br />classification according to the Orange County MPAH is presented in Table 13-1, along with the six <br />corresponding service levels and associated V/C ratios. <br />13.2 Roadway Link Level of Service Criteria <br />According to the City of Santa Ana, LOS D is the minimum acceptable condition that should be <br />maintained for roadway segments. However, the City of Santa Ana has defined exceptions to this <br />criteria in major development areas where LOS E is considered acceptable. <br />LOS "D"Reauiremeuts <br />A. Tustin Avenue, between Fourth Street and First Street <br />If the daily roadway V/C ratio results in unacceptable LOS conditions, a'peak hour link analysis is <br />conducted to determine if the roadway operates at a satisfactory service level during the peak hours. <br />75B-119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.