Laserfiche WebLink
13.3.2 Year 2019 Plus Project Analysis <br />Table 13-3 summarizes the results of the Year 2019 Plus Project daily analysis for the one (1) key <br />roadway segment. The first column (1) shows the number of lanes, the second column (2) shows the <br />arterial classification and the third column (3) shows the existing LOS `B" capacity. The fourth <br />column (4) shows the daily volume, V/C ratio and resulting level of service for "Year 2019 <br />Cumulative" traffic conditions. The fifth column (5) shows the daily volume, V/C ratio and resulting <br />level of service for "Year 2019 Cumulative Plus Project' traffic conditions and indicates whether the <br />traffic associated with the Project will have an impact based on the LOS standards defined in this <br />report. <br />Year 2019 Cumulative Traffic Conditions <br />An analysis of future (Year 2019) background traffic conditions indicates that the addition of <br />ambient traffic growth and cumulative projects traffic will not adversely impact the one (1) key <br />roadway segment. The one (1) key study roadway segment is forecast to continue to operate at <br />acceptable LOS A on a daily basis with the addition of ambient traffic growth and cumulative <br />projects traffic. <br />Year 2019 Cumulative Plus Proiect Traffic Conditions <br />Review of column (5) of Table 13-3 indicates that traffic associated with the proposed Project will <br />not significantly impact the one (1) key roadway segment, when compared to the LOS standards <br />specified in this report. The one (1) key roadway segment is forecast to continue to operate at an <br />acceptable LOS with the addition of project generated traffic in the Year 2019. <br />75B-123 <br />