My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - TUSTIN AND 4TH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
75B - PH - TUSTIN AND 4TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:21:49 PM
Creation date
11/15/2018 9:19:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program <br />Impacts RequiredIN[itigation Measu CS <br />V. Cultural Resources <br />Items (b) and (c) <br />The Tustin Avenue Retail Development Project site <br />AIM CR -A Should previously unidentified historical, <br />Implementing Entity: Project applicant/ <br />sill be graded prior to construction, and if during <br />archaeological or paleontological resources be uncovered during <br />developer and cultural resources expert <br />grading, it is revealed that previously unidentified <br />archaeological, Paleontological or geologic deposits <br />the course of construction, grading/construction shall be halted <br />in the area of concern so that the findings can be assessed. If it is <br />Monitoring en Ci of Sana Ara <br />g cY City <br />exist, an expect appropriate m the nature of the find <br />determined that more formal data collection u ed, needa <br />Planning and Building Agency <br />most be afforded the opportunity to evaluate any <br />controlled excavation shall be required to adequately record the <br />Timing: Grading/construction phase <br />additional finds and to complete an analysis in <br />find and recover (he associated materials in accordance with <br />accordance with CEQA guidelines, as amended. <br />CEQA guidelines, as amended. Excavating the materials in this <br />controlled manner will minimize the risk of any resources being <br />lost, damaged or destroyed. <br />AIM CR -1- Prior to the sten of construction, the project <br />Implementing Entity: Project applicant/ <br />developer shall retain a Native American Monitor to conduct a <br />developer and Native American Monitor <br />Native American Indian Sensitivity Training for cm snuction <br />Personnel prior to commencement of any excavation activities. <br />Monitoring en Ci of Santa Ana <br />� Agency: City <br />The training session shall include a lundout and focus on how to <br />Planning and Building Agency and Native <br />identify Native American resources encountered during <br />Amencon tribal group(s) <br />earthmoving activities and the procedures followed if resources <br />Timing: Grading/commrction phase <br />are discovered, dm duties of the Native American Monitor and <br />the general steps the Monitor would EORDw in conducting a <br />salvage investigation. The project developer shall renin a Native <br />American Monitor to be on-site during all project -related, <br />ground -disturbing construction activities (e.g., pavement removal, <br />auguring boring, grading, excavation, potholing, trenching, and <br />grubbing) of previously undutudxd native sods. <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />2 <br />75B-140 <br />
The URL can be used to link to this page
Your browser does not support the video tag.