My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - TUSTIN AND 4TH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
75B - PH - TUSTIN AND 4TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:21:49 PM
Creation date
11/15/2018 9:19:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS (CONTINUED) <br />SECTION PAGE <br />9.0 Site Access and Internal Circulation Evaluation <br />27 <br />9.1 Site Access.......................................................................................................................... 27 <br />9.2 Internal Circulation Evaluation........................................................................................... 27 <br />10.0 Recommended Intersection Improvements............................................................................ 29 <br />10.1 Existing Plus Project Traffic Conditions............................................................................ 29 <br />10.2 Year 2019 Plus Project Traffic Conditions......................................................................... 29 <br />11.0 Congestion Management Program (CMP) Compliance Assessment ................................... 30 <br />12.0 State Of California (Caltrans) Methodology.......................................................................... <br />31 <br />12.1 Highway Capacity Manual (HCM) Method of Analysis (Signalized Intersections) .......... <br />31 <br />12.2 Existing Plus Project Traffic Conditions — Caltrans Methodology .................................... <br />33 <br />12.2.1 Existing Traffic Conditions................................................................................. <br />33 <br />12.2.2 Existing Plus Project Traffic Conditions............................................................ <br />33 <br />12.3 Year 2019 Traffic Conditions — Caltrans Methodology..................................................... <br />34 <br />12.3.1 Year 2019 Cumulative Traffic Conditions......................................................... <br />34 <br />12.3.2 Year 2019 Cumulative Plus Project Traffic Conditions ..................................... <br />34 <br />12.4 Recommended Improvements — Caltrans Methodology..................................................... <br />37 <br />12.4.1 Existing Plus Project Traffic Conditions............................................................ <br />37 <br />12.4.2 Year 2019 Plus Project Traffic Conditions......................................................... <br />37 <br />13.0 Roadway Segment Evaluation................................................................................................. 38 <br />13.1 Roadway Link Capacities...................................................................................................38 <br />13.2 Roadway Link Level of Service Criteria............................................................................ 38 <br />13.3 Roadway Link Analysis Results......................................................................................... 40 <br />13.3.1 Existing Plus Project Analysis............................................................................ 40 <br />13.3.2 Year 2019 Plus Project Analysis......................................................................... 42 <br />14.0 Summary Of Findings And Conclusions................................................................................ 44 <br />75B-59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.