My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - TUSTIN AND 4TH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
75B - PH - TUSTIN AND 4TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:21:49 PM
Creation date
11/15/2018 9:19:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 3.2 <br />LEVEL OF SERVICE CRITERIA FOR UNSIGNALIZED INTERSECTIONS (HCM 6 METHODOLOGY)' <br />Level of Service <br />(LOS) <br />Highway Capacity Manual (RCM) <br />Delay Per Vehicle (seconds/vehicle) <br />Level of Service Description <br />A <br />< 10.0 <br />Little or no delay <br />B <br />> 10.0 and < 15.0 <br />I Short traffic delays <br />C <br />> 15.0 and:5 25.0 <br />I Average traffic delays <br />D <br />I > 25.0 and:5 35.0 <br />I Long traffic delays <br />E <br />I > 35.0 and < 50.0 <br />I Very long traffic delays <br />F <br />> 50.0 <br />Severe congestion <br />'- Source: Highway Capacity Manual 6, Chapter 20: Two -Way Stop -Controlled Intersections. The LOS criteria apply to each lane on a given <br />approach and to each approach on the minor street LOS is not calculated for major -street approaches or for the intersection as a whole. <br />75B-78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.