My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - TUSTIN AND 4TH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
75B - PH - TUSTIN AND 4TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:21:49 PM
Creation date
11/15/2018 9:19:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
respectively. Figure 5-4 also presents the daily Project traffic volumes. The traffic volume <br />assignments presented in Figures 5-3 and 5-4 reflect the traffic distribution characteristics shown in <br />Figures 5-1 and 5-2 and the traffic generation forecast presented in Table 5-1. <br />5.3 Existing Plus Project Traffic Conditions <br />The Existing Plus Project traffic conditions have been generated based upon existing conditions and <br />the estimated project traffic. These forecast traffic conditions have been prepared pursuant to the <br />California Environmental Quality Act (CEQA) guidelines, which require that the potential impacts <br />of a Project be evaluated upon the circulation system as it currently exists. This traffic volume <br />scenario and the related intersection capacity analyses will identify the roadway improvements <br />necessary to mitigate the direct traffic impacts of the Project, if any. <br />Figures 5-5 and 5-6 present projected AM and PM peak hour traffic volumes at the four (4) key <br />study intersections and three (3) Project driveways with the addition of the trips generated by the <br />proposed Project to existing traffic volumes. Figure 5-6 also presents the Existing Plus Project daily <br />traffic volumes. <br />75B-83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.