My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-11-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
FULL PACKET_2018-11-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 7:39:12 AM
Creation date
11/19/2018 7:26:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
11/20/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1082
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />CONTRACT AGREEMENT STATEMENT <br />RMA Group has reviewed the RFP in its entirety and <br />is in concurrence with any and all provisions in the <br />Agreement attached to the RFP. <br />FIRM AND TEAM EXPERIENCE <br />FIRM HISTORY <br />Established in 1962, we are a California corporation with <br />professional offices and laboratory facilities strategically <br />located within California's thriving economic centers in <br />Los Angeles, the Inland Empire, San Francisco Bay <br />area, San Diego, and Sacramento Valley. The breadth <br />of our regional coverage allows us to complete any size <br />project throughout the state. <br />Today we have grown to employ nearly 250 of the <br />industry's brightest civil and geotechnical engineers, <br />registered geologists, certified engineering geologists, <br />and registered environmental assessors who provide <br />our firm with comprehensive geotechnical and <br />environmental capabilities. RMA Group's geotechnical <br />and geologic design services include preliminary <br />geotechnical investigations, foundation studies, <br />fault investigations, liquefaction analysis, Phase 1 <br />environmental site assessments, and geotechnical and <br />geologic review of grading and foundation plans. <br />Over the course of our history, RMA Group has <br />developed long standing positive relationships with the <br />agencies and firms with which we interact, establishing <br />clear lines of communication and complete team <br />integration. We act as an extension of our clients' staff <br />and are fully invested in the successful outcome of <br />their projects. Our clients trust us to act in their best <br />interest by providing superior levels of quality with strict <br />adherence to their budgets and schedules. <br />FIRM EXPERIENCE <br />RMA Group is the most qualified consultant to provide <br />your on-call materials testing, special inspection, and <br />geotechnical engineering needs. We have worked on <br />hundreds of capital improvement projects providing <br />professional services for street reconstruction, street <br />resurfacing, slurry sealing, storm drain replacement <br />and construction, sewer repair, and upgrades. We <br />are experts in the services and project types that the <br />City requires and we offer the necessary combination <br />of skills and experience. RMA Group has earned a <br />reputation for high quality professional services, and for <br />unparalleled responsiveness to our clients' needs and <br />expectations. This has led to many successful long- <br />term client relationships. Over our 56 year history, we <br />have held relevant City and County contracts including <br />San Bernardino County, City of Long Beach, County of <br />Los Angeles, City of West Covina, City of Norwalk, and <br />many more. <br />TEAM EXPERIENCE <br />RMA Group's key personnel has a rich history of work <br />on public works projects built from experience on more <br />than 2,000 projects in the last decade. Through their <br />experience, they have gained a working knowledge <br />that allows them to take a lead role in maintaining <br />the quality assurance of a project. This history of <br />experience provides lessons learned from strategic <br />staffing to document control. RMA Group has a focused <br />management aptitude for capitalizing on each project's <br />successes to implement internal processesto continually <br />improve their level of service. <br />Page4I CITY OF SANBTA ANA I PPUBLIC WORKS GEOTECHNICAL ENGINEERING SERVICES <br />12, 25B-94 <br />IV RMA Croup) <br />EveryProject Matterslwww.rmacompaniescom <br />< <br />Inland Eni Utilities Agency <br />Calbans <br />OryofWestCwina <br />ca<amongavalley, water District <br />county ofMonmFey <br />cn aroumond Bar <br />Eanern Municipal Water OisInds <br />Ciry of Rancho Cocarmini <br />Orroffiverade <br />YucaloavallryWater Uil <br />Ciryof(Imand <br />Gryof Las Angeles <br />Nctoriii0eyWat<r Disvits <br />Ciryofpems <br />GryofRielm <br />Participation Water District of Southern <br />"grarria <br />GtyafFeradene <br />Burbanh4'siddre Pasadena Airport <br />Ammar, <br />Use Hemet Municipal Water ciaritl <br />GryofCOrona <br />GryofGlendara <br />Dourralleywater District <br />CiryofFullenan <br />Gryof Pomona <br />Grygifts Angeles Department attract <br />ad, power <br />ofAra <br />Gryus <br />Driftcounty, Port of Nn Diego <br />MebomlicanTranSportation Agency <br />Ciry NBaritox <br />Gryii <br />Counryofsan Bernardino <br />Transportation and Flood Control <br />DeparunentgfpublicwoAs <br />Aringecture,Buildingand Fng4 <br />ne ring <br />Soddial Disgicts <br />Gryof Chino Hllls <br />Gnafchim <br />Gnafcaremont <br />OryasimiNlley <br />Caunry of flivnsideTransportatlon <br />Department <br />Gryof Ontario <br />Gngfloveme <br />Gntfcadabad <br />Son Benami oAssotlaled Govemments <br />Gly of El Cenuo <br />Countyoflos Angeles Department of <br />Publie Works <br />Grygf mMalet <br />Gryofvallejo <br />Gryofeampbell <br />GtrodNmwalk <br />CiryofWaim Oeek <br />Cit,occancord <br />Gry isi San F—clsm <br />GryafBnnlwo% <br />G Dorado Imigatitn District <br />Gryof Union Ciry <br />Gryafsanamento <br />Clnofiva emg Verities Department <br />city of Megan Hill <br />Gn arw<a Lnamenm <br />Gryofsalinm <br />Grya(sanlOse <br />CiryofCitrus H<igM1[s <br />Ganomia slam un' "By <br />Grygtminda <br />c'.1iopevme <br />Univeni of GBig mla <br />Gnaf Dakky <br />I Gn OfChka <br />El Dorado County Department of. <br />Transportation <br />Gryof Dvermore <br />Clryo mpsmo <br />TEAM EXPERIENCE <br />RMA Group's key personnel has a rich history of work <br />on public works projects built from experience on more <br />than 2,000 projects in the last decade. Through their <br />experience, they have gained a working knowledge <br />that allows them to take a lead role in maintaining <br />the quality assurance of a project. This history of <br />experience provides lessons learned from strategic <br />staffing to document control. RMA Group has a focused <br />management aptitude for capitalizing on each project's <br />successes to implement internal processesto continually <br />improve their level of service. <br />Page4I CITY OF SANBTA ANA I PPUBLIC WORKS GEOTECHNICAL ENGINEERING SERVICES <br />12, 25B-94 <br />IV RMA Croup) <br />EveryProject Matterslwww.rmacompaniescom <br />
The URL can be used to link to this page
Your browser does not support the video tag.