Laserfiche WebLink
MT <br />• • .. 0 1 DVR M I =1 oil 14:4 <br />Communication plays a major role in the success <br />of a project. We understand how various project <br />delivery methods influence project collaboration and <br />interaction. SCST is in daily communication with <br />each of our project teams. We know that a lack of or <br />insufficient communication between team members <br />can lead to costly mistakes and we are committed to <br />help the City avoid these issues. We are dedicated to <br />transparency and cooperation with all stakeholders, <br />including architects, designers, engineers, construction <br />managers, contractors, and other project team members <br />to successfully deliver our services with a continuous <br />focus on quality, cost, and schedule. <br />At SCST, we apply time -tested methods to assure the <br />high quality, dependable services our clients have <br />come to expect. Because every project is different, we <br />will work with the City and project team to understand <br />the project objectives and to tailor the best approach <br />to successfully complete each specific project. As <br />demonstrated by our project experience and references <br />listed in this submittal, we have the experience, staff, <br />systems, and safeguards in place to deliver services <br />for this contract with diligence and in a cost-effective <br />manner to serve the best interests of the City. In addition, <br />we have all the proper equipment necessary to perform <br />the required services. <br />Selecting the appropriate inspector or technician for a <br />project is one of SCST's highest priorities. SCST will <br />provide the City with full-time, multi -carded inspectors <br />or technicians whenever possible, enabling us to <br />maximize staff utilization and avoid duplication. Our <br />technicians and inspectors will be available within 24 <br />hours of a request from the City. Once a request is <br />made by the City, Jeanine Watson, SCST's dispatcher, <br />schedules field staff via Agile Frameworks MetaField® <br />V2.6 software, which allows for efficient scheduling <br />and managing of field and laboratory service. When an <br />inspector or technician is scheduled, an email alert is <br />sent from MetaField to the individual with the date of <br />service, time of arrival, project address, on -site contact <br />person and their phone number, the assigned inspection <br />or testing to be performed, and additional notes. <br />The daily schedule is available to all SCST personnel, <br />enabling the field staff to view their project schedules, <br />and enabling our project management team to ensure <br />that we are effectively providing the correct staff <br />members to perform the requested services. Both our <br />:1 <br />project manager and dispatcher will be available to <br />the City 24 hours a day and will be able to resolve any <br />questions or problems that arise during a project. <br />SCST can utilize the same project team that performed <br />engineering work, aiding in the capacity to make quick <br />and effective decisions in the field relating to the original <br />geotechnical engineering assumptions. Our inspectors <br />and technicians are well versed in the implementation of <br />construction inspection and testing requirements, and <br />are experienced with a wide variety of materials used in <br />construction. <br />Once a project begins, it is tracked using Ajera, our <br />internal accounting software, giving us paperless <br />system capacities. The software maintains real-time <br />accounting of resources used on the project and displays <br />this graphically to each project manager's desktop. The <br />project management component of the software gives <br />our project manager the ability to review scheduling <br />ism ,.win <br />mow, <br />and budgeting at any time, expediting communication <br />between our project manager and the City, without the <br />need for additional analysis. <br />Our practice is to closely monitor the frequency of your <br />dispatch and diligently manage the budget on all our <br />projects to keep the City alerted of any anticipated <br />budgeting issues. Once we have reached 70% of <br />the individual line -item budget authorizations, we <br />will schedule a meeting with the City and any other <br />designated representatives to compare the remaining <br />work with the construction schedule, and provide you <br />with a cost -to -complete in an effort to avoid additional <br />authorizations. We will not exceed the authorized <br />budget without specific orders from you or your <br />City of Santa Ana RFP No, 18-045, Geotechnical Engineering Services <br />SCST Proposal No. 18-0308 <br />