Laserfiche WebLink
old 3. FEE PROPOSAL <br />TECHNICAL <br />TITLE <br />Principal Engineer/Geologist <br />HOURLY RATE <br />$174.00 <br />Senior Engineer/Geologist <br />$155,00 <br />Project Engineer/Geologist <br />$115.00 <br />Associate Staff Engineer/Geologist <br />$96.00 <br />Senior Soil Technician - Lab Only/Non-Prevailing Wage <br />$68.00 <br />Soil Technician - Lab Only/Non-Prevailing Wage <br />$60.00 <br />CARD Technician <br />$77.00 <br />Group 1 • Prevailing Wage <br />$98.00 <br />Group 2 - Prevailing Wage <br />$102.00 <br />Group 3 - Prevailing Wage <br />$106.00 <br />TITLE HOURLY RATE <br />Office Assistant $55.00 <br />Billing Administrator $55.00 <br />City of Santa Ana RFP No 18-045, Geotochnical Enginearing Services <br />SCST Proposal No. 18,030E <br />