STATEMENT OF QUALIFICATIONS
<br />ERIC DIAZ I PUBLICWORKS INSPECTOR/TECHNICIAN
<br />Mr. Eric Diaz has more than 14years of experience in construction quality management,
<br />inspection, and testing that spans a variety project types including transportation,
<br />public works, education, water / waste water treatment, and residential and
<br />commercial development.
<br />As Lead Inspector, Eric performs Quality Control inspections on projects involving
<br />reinforced and pre -stressed concrete structures, trench safety and backfill operations,
<br />and tensioning rockanchor bolts; his technical background in reinforced concrete and
<br />his extensive experience working on projects constructed in accordance with Caltrans
<br />requirements make him uniquely qualified to serve as Lead Inspector for highway
<br />projects.
<br />POMONA BOULEVARD STREET REHABILITATION, POMONA
<br />Public Works Special Inspector/Technician I Mr. Diaz serves as a Special Inspector forth Pomona Boulevard Street Rehabilitation
<br />Project, RMA Group provided materials tests performed on asphalt concrete samples obtained from the Pomona Boulevard Street
<br />Rehabilitation site bywas delivered to our laboratoryfor testing. Laboratory testing was performed uriderthe responsible charge of
<br />a Registered Civil Engineer in accordance to the following standard test methods CTM 308 Specific Gravity of Bituminous Mixtures
<br />and CTM 366 Determination of Hveem Stability of Bituminous Mixtures.
<br />1-405 / SEPULVEDA PASS WIDENING PROJECT, LOS ANGELES
<br />Public Works Special Inspector / Technician I Mr. Diaz is a Civil and Bridge Inspector at the project inspecting structural bridge
<br />construction and civil roadway improvements; elements inspected include embankment, MSEwalls, aggregate base, asphalt concrete,
<br />Portland cement concrete, sub -grade, roadway construction, bridge construction, and pile construction. The 1-405 Sepulveda Pass
<br />Widening Project consists of adding a 10-mile high -occupancy vehicle (HOV) lane on the northbound 1-405 between the 1-10 and US
<br />101 Freeways, removal and replacement of 3 bridges, realignment of 27 on -and off- ramps, widening of 13 existing underpasses and
<br />structures, and the construction of approximately 18 miles of retaining wall and sound walls.
<br />INLAND EMPIRE UTILITY AGENCY CAPITAL IMPROVEMENT PROJECTS, CHINO AND ONTARIO
<br />Public Works Special Inspector / Technician I Mr. Diaz served. as the Special Inspector for Inland Empire Utility Agency capital
<br />improvement projects. He was responsible for all quality assurance activities including inspection of structures, documentation on
<br />force account work, performing safety inspections and labor compliance interviews, preparing as -built drawings and approval of
<br />quantities and pay requests.
<br />BREA CANYON GRADE SEPARATION, WALNUT
<br />Public Works Special Inspector/Technician I Mr. Diaz served as Special Inspector for the Brea Canyon Grade Separation Project. His
<br />scope of work consisted of reinforced concrete retaining walls and bridge structure, associated roadway and drainage improvements.
<br />The project included the construction of seven concrete retaining walls, 26 precast -pre -stressed concrete girders for a new Union
<br />Pacific Rail Road bridge, 5,500 tons of asphalt and 4,500 cubic yards of concrete roadways and 55,000 square foot of new parking
<br />lot improvements.
<br />EXPO VENICE / ROBERTSON AERIAL STATION AND BRIDGE STRUCTURE, LOS ANGELES
<br />Public Works Special Inspector / Technician I Mr. Diaz is responsible for supervision and coordination of inspections and testing on
<br />a daily basis, primary review of inspection and testing records, and implementation of Quality Program Manual. Involved in grading,
<br />mass reinforced concrete placements, embedded anchorage, stray current -cathodic system, structural steel support installation,
<br />aluminum curtain wall glazing system, post tension concrete, grouting, cable railing, scheduling inspections, water proofing install,
<br />and concrete pavers; testing of compaction, concrete, welding, tensioning, epoxy bounding, rebar, hydrostatic. 800 foot aerial
<br />structure consisting of post -tensioned soffit and decks, structure made up of 5 frames connected with structural hinges, including
<br />stem walls and a platform. Entire structure supported by abutments utilizing CIDH pile foundation systems. All Portland cement
<br />concrete materials and construction utilized were in accordance with Caltrans Standard Specifications and Standard Plans, including
<br />the provisions of Section 90.
<br />Page 12 CITY OF SANTA ANA I PUBLIC WORKS GEOTECHNICAL ENGINEERING SERVICES
<br />DULY 12, 2018 1 18-1052-P
<br />RMA Group
<br />Every Project Matters www.rmccompanies.com
<br />
|