My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RMA GROUP
Clerk
>
Contracts / Agreements
>
R
>
RMA GROUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 8:38:27 AM
Creation date
12/7/2018 4:42:33 PM
Metadata
Fields
Template:
Contracts
Company Name
RMA GROUP
Contract #
A-2018-257
Agency
PUBLIC WORKS
Council Approval Date
11/20/2018
Expiration Date
11/19/2021
Insurance Exp Date
10/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />CHARLES LEVINSON I PUBLIC WORKS INSPECTOR/TECHNICIAN <br />Charles is experienced in field inspection / testing of masonry, concrete, and soils. <br />With more than 14 years in construction, he has worked on a wide range of projects <br />including transportation, medical facilities, residential, schools, and building facilities <br />in both public and private sectors. <br />His duties include field inspection, sampling and testing of concrete, sampling <br />and testing of rebar, sampling and testing of masonry. He carries (2) ICC structural <br />inspection cards and is soil gauge operator certified. This allows him to provide <br />continuity to the project by providing multiple inspections without substitutions. <br />RELEVANT PROJECT INVOLVEMENT / EXPERIENCE <br />1.805/ HOV AND BRT DESIGN BUILD, SAN DIEGO <br />Public Works Special Inspector / Technician I The project will construct one median <br />HOV / BRT lane in each direction with median barriers; retaining walls, widening of <br />the Governor Drive under -crossing and Rose Canyon Bridge for the median lanes. <br />Provide for DAR ramps and HOV / BRT median lanes south to SR-52 at Carroll Canyon <br />Road and DAR at Nobel Drive. Fernando has provided inspection, sampling and <br />testing of concrete pouring including batchplant inspection, and sampling of concrete <br />pours in accordance with Caltrans testing methods including slump, entrained air, <br />and inspected grade preparation for bituminous or concrete paving. <br />SUNRISE POWER LINK, SAN DIEGO <br />Public Works Special Inspector / Technician I Mr. Levinson provided earthwork, soils compaction concrete and asphalt inspections. <br />110 miles of overhead 500kV and 230kV transmission towers and conductor, 6.2 miles of underground 230kV cable and a 40-acre, <br />500kV / 230kV transmission substation. 438 concrete tower foundations and 1.3 million cubic yards of earthwork moved during <br />construction, nearly 75 percent of the construction was performed by helicopters and the project logged more than 30,000 flight <br />hours <br />SMUGGLER GULCH, INTERNATIONAL BORDER FENCE PROJECT, SAN DIEGO <br />Public Works Special Inspector / Technician I Inspection during construction of 10.4 miles of roadway to facilitate construction <br />of the border fence located at Monument 250 between Tecate Peak and Otay Mesa. Mr. Levinson inspection duties included soils <br />inspection nuclear density gauge testing and special concrete inspection for 10 bridge abutments constructed as part of the border <br />fence installation. Tested concrete aggregates during production of field manufactured concrete, obtained and sampled concrete <br />in accordance to ACI test methods. Submitted daily reports for quality control to the satisfaction of the USArmy Corps of Engineers <br />requirements during this project. <br />SR 125 TOLL ROAD AND GAP / CONNECTOR, SAN DIEGO <br />(Public Works Special Inspector / Technician I Mr. Levinson provided testing and materials sampling during construction which <br />consists of 14 miles of heavy highway and bridges. Laboratory testing of materials utilized for sub -grade, road base and concrete <br />aggregate to determine compliance with Plans and Specifications and specific contract requirements. Duties for this project also <br />include testing soil compaction, concrete placement for 20 bridges, and asphalt roadway placement and compaction in accordance <br />with the Caltrans methods. <br />RJ DONOVAN INFILL PROJECT - STATE OF CALIFORNIA, DEPARTMENT OF CORRECTIONS & REHABILITATION, SAN DIEGO <br />Public Works Special Inspector/Technician I Mr. Levinson is providing soil, concrete, and masonrysampling and testing aswell as <br />anchor pull testing and torque testing for this new 317,000-square-foot housing facility major detention center project . The $169 <br />million project includes 3 level II, 264 bed housing units. In addition to these housing units, the project also includes other facilities <br />for programming, health care, visitation and other support components <br />POSEIDON DESALINATION PLANT, CARLSBAD <br />Public Works Special Inspector/ Technician [Mr. Levinson provided special inspections and quality control observations for soil, <br />concrete, and reinforcing steel for this $1 Billion project. RMA Group is currently providing materials testing and inspection on <br />both the construction of the desalination plant and its associated onsite facilities and of the installation of 10-mile pipeline and the <br />preliminary construction of the Aqueduct Connection Facilities. <br />Page 14 CITY OF SANTA ANA I PUBLIC WORKS GEOTECHNICAL ENGINEERING SERVICES <br />1 U LY 12, 2018 1 18-1052-P <br />�� <br />RMA Group <br />FveryProjeat Matters( www.rmacompanies.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.