My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RMA GROUP
Clerk
>
Contracts / Agreements
>
R
>
RMA GROUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 8:38:27 AM
Creation date
12/7/2018 4:42:33 PM
Metadata
Fields
Template:
Contracts
Company Name
RMA GROUP
Contract #
A-2018-257
Agency
PUBLIC WORKS
Council Approval Date
11/20/2018
Expiration Date
11/19/2021
Insurance Exp Date
10/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERALCHARGES <br />e RMA Group requires twenty-four(24) hour prior notification for scheduling inspectors and/or technicians.. <br />o Inspection charges start at the scheduled show up time at the job site. All Inspection hours will be billed In the following <br />Increments: <br />c There will be a minimum two (2) hour charge for any RMA Groupemployee presence on site. <br />+ .Anytime less than four (4) hours of work will be billed as four (4) hours. <br />: Four (4) to eight (8) hours will be billed as eight (8) hours, <br />• When personnel are required to work in excess of 5 hours without an uninterrupted meal period of 30 minutes, due toproject <br />constraints, h hour will be charged at double time rates in addition to any applicable hours worked. <br />e Rates are valid through June 30, 2019. Rates for personnel will Increase by 3% per year on July 1st of each subsequent year. <br />• Administrative/clerical support will be charged at 5% of the monthly direct charges. <br />a Certified Payroll Reports will be prepared upon request. There will be a $75.00 charge for each certified payroll report. <br />• Outside services will be billed at cost plus 15%unless billed directly to and paid for by Client,. <br />m Requests made by client for management: attendance at meetings at theproject site will be charged at standard rate. <br />OVERTIME CHARGES <br />Work performed in excess of 8 hours per day and/or up to eight (S) hours on Saturdays will be billed at 1.5 times the unit rate. <br />Work performed on Sunday, recognized holidays, or In excess of eight (8) hours on Saturdays will be billed at 2.0 times the unit <br />rate <br />® A20% surcharge will be applied for laboratory tests performed on a Saturday or Sunday. <br />PER DIEM AND TRAVEL CHARGES <br />. An $85.00 charge per day will be applied when our personnel are required to stay overnight at remote locations. <br />• Time will be billed at the unit rate while traveling to a remote location or if a location requires an overnight stay <br />Mileage for travel outside a 50 mile radius from either the projectsite or the nearest RMA facility whichever is closest, will be <br />charged at a rate of $0.55 per mile. <br />NIGHT WORK <br />a A$10.00 per hour surcharge willbe added to all personnel rates for work performed during night shifts. <br />RMA Group <br />EveivPrniea Matters www.rmacomorvmes.mm <br />CITY OF SANTA ANA ) PUBLIC WORKS GEOTECHNICAL ENGINEERING SERVICES Page 10 <br />JULY 12. 2018 1 18-1052-P <br />
The URL can be used to link to this page
Your browser does not support the video tag.