My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT BICYCLE PROJ CONSULTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
01/15/2019
>
25G - AGMT BICYCLE PROJ CONSULTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 7:01:53 PM
Creation date
1/10/2019 6:57:41 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
1/15/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRM AND TEAM EXPERIENCE <br />MwrreA <br />i <br />We are excited to team with NUVIS to provide landscape and Irrigation services. NUVIS is a certifI ied D/MBE <br />and SBE firm with a local office in Costa Mesa. NUVIS has designed numerous roundabouts and traffic circles <br />for urban environments, historical/cultural sites, and street improvement projects with bike facilities. They work <br />with landscape, hardscape alternatives, and incorporate hard -wired and solar -powered irrigation options. <br />We also welcome Guide Surveying, Inc. (Guide) who provides years of reliable and accurate surveying <br />experience to our team. Headquartered in Irvine, they are a multi -disciplined land surveying firm that has <br />provided project -based and on-call geomatics services throughout California since 1995. For bike boulevard <br />projects, it is anticipated that topographic and point surveys will be required to a minimum 100 feet from the <br />BCR of the intersection. Surveys will also assist us in meeting ADA compliance requirements. <br />Twining Inc. has successfully provided geotechnical investigation services for our bike boulevard 'projects. <br />Their services will range from identifying pavement sections and performing percolation testing for biofiltration <br />system treatments. <br />ORGANIZATION CHART <br />Below is KOA's organization chart. It reflects our proposed key and support staff, each person's availability to <br />the project, proposed subconsultant staff, and the lines of communication for completing the project. <br />LEGEND: <br />■ KOA <br />© NUVIS <br />ED Guida <br />■ Tvdning <br />(##°6) = Percent Available for the Project <br />o sea <br />Chuck Stephan, PE (30%) <br />Ray Wang, PE <br />Task Leader <br />Alan Yasuda, EIT (35%) <br />Perry A. Cardoza, PLA, <br />PLSA(20%) <br />Task Leader <br />Ray Wang, PE <br />Task Leader <br />Ray Wang, PE (50%) Min Zhou, PE (20%) <br />Thao Le, EIT (60%) <br />Ryan Calad, PE (45%) <br />Task Leader <br />I Kevin Kelley, EIT (35%) <br />Walter Okitsu, PE, <br />PTOE, PTP (509A) <br />Task Leader <br />Thao Le, EIT <br />Calvin Yoshnake. PS AMr Ghavibazoo, PHD <br />(50%) (25%) <br />Task Leader Task Leader <br />BUSH STREET BICYCLE BOULEVARD DESIGN SERVICES <br />RFP NO. 18-072 <br />CITY OF <br />25G-58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.