My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT BICYCLE PROJ CONSULTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
01/15/2019
>
25G - AGMT BICYCLE PROJ CONSULTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 7:01:53 PM
Creation date
1/10/2019 6:57:41 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
1/15/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELEVANT PROJECT EXPERIENCE WITH REFERENCES <br />CITY OF SANTA MONICA MICHIGAN AVENUE CYCLE <br />TRACK <br />SANTA MONICA, CA <br />The City installed a new bikeway adjacent to Santa Monica High School. <br />KOA was hired late in the engineering phase of the project to design a <br />separated bike lane that consisted of a raised one-way bicycle side path. <br />KOA conducted a field survey and prepared street Improvement plans <br />for the new off-street bike path and curb modifications, as well as bid <br />quantities for incorporation into the larger school bikeway project. The <br />bikeway was later extended eastward by the City Into what became the <br />Michigan Avenue Neighborhood Greenway (MANGo). <br />KOA PM: Joel Falter <br />CITY OF SANTA MONICA - Name: Michelle Glickert, Phone Number: <br />(310) 458-2204, Email: michelle.glickert@smgov.net <br />25G-65 <br />KLA <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.