My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARKETING POWER, INC dba ENERGY RETROFIT, CO.
Clerk
>
Contracts / Agreements
>
M
>
MARKETING POWER, INC dba ENERGY RETROFIT, CO.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2019 1:02:16 PM
Creation date
1/14/2019 12:59:55 PM
Metadata
Fields
Template:
Contracts
Company Name
MARKETING POWER, INC dba ENERGY RETROFIT, CO.
Contract #
A-2018-260
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
11/20/2018
Expiration Date
3/29/2019
Insurance Exp Date
1/1/1900
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anaheim Convention Center <br />$360,347Annaal Energy Savings <br />PROJECT DESCRIPTION <br />Anaheim Convention center awarded Energy Retrofit Co, a contraot to replace their outdated T12 Pluoreseent HO <br />fixtures, After the Initial contract was completed, the facilities staff requested ERC to design -build additional work to <br />complete the exterior lighting, office lighting, and parking garage lighting, The additional lighting work was done as a <br />"change order" to the Initial contract and was paid for using a combination of U.S, department of Energy's Energy <br />Efficiency and Conservation Block Grant (EECBG) Program and Anaheim Utility Rebates, <br />. roieot Images <br />SCOPE OF WORK <br />✓ Replaced aver 2000 T12 fluorescent fixtures with new low wattage fixtures with bilevel occupancy controls <br />in the parking garage, <br />✓ Retrofitted all Interior office lighting and all common areas with new low wattage system. <br />✓ Energy savings exceeded.$980K per year. <br />✓ Overall project cost = $785K, <br />PROJECT CHALLENGES & SOLUTIONS <br />✓ t eeyear,con/with no doention wn ti er and forkon installati ning garage eto bere tsoheduledremely SY —operating 94 -hours per day, every day of <br />✓ The ERC installation team worked closely with facilities management to coordinate product delivery and <br />installation between convention center event dates; <br />✓ The ERC installation team worked double shifts to ensure theta[] 2,000+ convention center hall fixtures <br />wore safely installed in under 45 days, with no impact to the center's schedule of events, <br />ENERzw 62 t3MT Go. 14 <br />a,umm^uunyf s%dq w,nnp <br />
The URL can be used to link to this page
Your browser does not support the video tag.