Laserfiche WebLink
City of Santa Ana Public Works <br />Attn: John Agu Ilar / Christy Kind Ig <br />714-647.5008 <br />Scope of Work — Ross Annex Parking Garage <br />Option A (Sky(er Parking Garage Fixture 40W) - $36,9$6.50 <br />Estimated SCE Midstream Rebate - $1,040 (not included in project cost) <br />RETREIRTIC0. <br />of Fnerpy S -rice M61MY <br />Based on the review of this project, Option A includes the requested Skyler Parking Garage fixture <br />40W with integrated smart sensor, <br />• The base bid Includes removing and recycling all parking garage fixtures and installing new <br />Skyier Parking Garage Fixtures. <br />• Twelve fixtures will be added to the overall total, which includes all new wiring and j boxes. <br />• Per Title 24 requirements, occupancy sensors will be commissioned on all Skylar Fixtures. <br />• Title 24 certification forms NRCC.LTI will be followed and engineered by a CALTCP <br />Technician for this project, <br />Option 0 (32 IPark 5 Parking Garage Fixture 33W) . $21,367.40 <br />Estimated SCE Midstream Rebate - $780 (not included In project cost) <br />Based on the review of this project, Option B Includes the 12 IPark 5 Fixture 33W with integrated <br />sensor. <br />• The base bid includes removing and recycling all parking garage fixtures and. Installing new <br />J2 IPark 5 fixtures. <br />• Twelve fixtures will be added to the overall total, which Includes all new wiring and j boxes, <br />• Per Title 24 requirements, occupancy sensors will be commissioned on all J2 Fixtures, <br />• Title 24 certification forms NRCCATI will be followed and engineered by a CALTCP <br />Technician for this project, <br />