My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTHERN CALIFORNIA EDISON
Clerk
>
Contracts / Agreements
>
S
>
SOUTHERN CALIFORNIA EDISON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 12:55:09 PM
Creation date
1/28/2019 8:52:08 AM
Metadata
Fields
Template:
Contracts
Company Name
SOUTHERN CALIFORNIA EDISON
Contract #
A-2019-009
Agency
PUBLIC WORKS
Council Approval Date
1/15/2019
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pollution Control, Solid Waste Disposal, Resource Conservation Recovery and <br />Comprehensive Environmental Response Compensation and Liability Acts, and the <br />California Environment Quality Act, and the rules, regulations, and ordinances of the <br />City, the California Department of Health Services, the Regional Water Quality <br />Control Board, the State Water Resources Control Board, the Environmental <br />Protection Agency, and all applicable federal, state, and local agencies and bureaus. <br />Right of Possession <br />5.1 Right of Possession. The Parties agree to deliver to each other quiet and peaceful physical <br />and legal possession of the respective Properties, free of all personal property, effective as <br />of the Close of Escrow. <br />6. As -Is Condition <br />6.1 As -Is Condition. Parties shall rely solely and exclusively upon the results of their own Due <br />Diligence Investigations of the subject Properties with regard to any physical condition or <br />state of the Properties. By completing the exchange of the Properties, Parties evidence their <br />unconditional acceptance of the condition of each respective Property. Parties acknowledge <br />and agree that each is acquiring its respective Property on an "AS -IS," "WHERE -IS" basis. <br />Parties are not offering to acquire the respective Property based on any representation by the <br />other Party, or a third party, except those expressly set forth in this Agreement. Parties <br />hereby acknowledge that the exchange of the Properties is without warranties of any kind <br />from the other Party, expressed or implied, except as expressly set forth in this Agreement, <br />as to the condition of the subject Property or its improvements, if any, including, without <br />implied limitation, soils, access to the subject Property or to utilities, appliances, structure <br />utility systems, roof, foundation, landscaping or any other component of the subject Property. <br />Parties do not warrant that either Property conforms with any ordinances, including, without <br />implied limitation, zoning or building ordinances. <br />6.2 SCE Disclosure; Post -Closing Testing. SCE conducted environmental testing on the SCE <br />Property, which produced three samples at 0.5 feet with arsenic concentrations of 6.4, 8.6 <br />and 13 mg/kg. SCE has agreed to do additional testing of the SCE Property after the Close <br />of Escrow once the City has demolished and removed the existing substation, including its <br />foundation and slab. SCE will take eight (8) additional soil samples at 0.5 and 2.0 feet. <br />SCE's consultant will calculate the 95% upper control limit ("UCL") of the mean for the two <br />previous and the eight new samples at 0.5 feet using the Environmental Protection Agency's <br />distributed program ProUCL 5.1. The result will be compared to the California Department <br />of Toxic Substances Control's criteria of 12 mg/kg for school sites. If the 95% UCL of the <br />mean is less than the screening criteria, (a) the SCE Property will be immediately available <br />for use by the City and (b) SCE will not remediate the SCE Property. If the 95% UCL of the <br />mean exceeds the criteria, then a shallow soil excavation and haul remediation plan will be <br />developed and implemented by SCE. The SCE Property will be available for City use upon <br />the completion of the SCE remediation plan. The City shall issue a temporary entry permit <br />to SCE for such testing and remediation. The obligations of this Section 6.2 shall survive <br />the Closing. <br />Acknowledgement of Full Benefits <br />Page 6 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.