My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75E - PH - 2525 N. MAIN ST._ADJOURNED
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
02/19/2019
>
75E - PH - 2525 N. MAIN ST._ADJOURNED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:12:32 PM
Creation date
2/14/2019 2:23:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75E
Date
2/19/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />9.16.4 Water Supply <br />Threshold: Would the Project have sufficient water supplies available to serve the Project from <br />existing entitlements and resources, or are new or expanded entitlements needed? <br />Finding: Less than significant impact. (DEIR, p. 4.13-7 through 4.13-8.) <br />Facts in Support of Finding: The City's Urban Water Management Plan (UWMP) anticipates a supply <br />and demand increase of 8.2 percent (3,028 acre feet per year) relating to water. The Project would result <br />in an increase in demand for water supplies that is between just 2.7 and 4.2 percent of the UWMP's <br />anticipated increase. Accordingly, the City would have water supplies available to serve the Project from <br />existing entitlements. (DEIR, p. 4.13-7 through 4.13-8.) <br />For the reasons discussed above and the reasons discussed in the DEIR, impacts associated with this issue <br />would be less than significant, and no mitigation is required. (DEIR, p. 4.13-7 through 4.13-8.) <br />9.16.5 Wastewater Treatment Capacity <br />Threshold: Would the Project result in a determination by the wastewater treatment provider, <br />which serves or may serve the Project, that it has adequate capacity to serve the Project's projected demand <br />in addition to the provider's existing commitments? <br />Finding: Less than significant impact. (DEIR, p. 4.13-11.) <br />Facts in Support of Finding: Based on results of the sewer flow monitoring and the City's Design <br />Criteria wastewater generation rates, the Sewer Study identified that the existing sewer lines that serve the <br />Project site would be able to adequately handle the additional wastewater flows from the Project. <br />Additionally, the existing wastewater treatment facilities have adequate capacity to accommodate the <br />increase in wastewater flow from full occupancy of the Project. As a result, implementation of the Project <br />would not result in inadequate capacity of the wastewater treatment plant to serve the Project's demand <br />in addition to existing service commitments. (DEIR, p. 4.13-11.) <br />For the reasons discussed above and the reasons discussed in the DEIR, impacts associated with this issue <br />would be less than significant, and no mitigation is required. (DEIR, p. 4.13-11.) <br />9.16.6 Solid Waste Facilities <br />Threshold: Would the Project be served by a landfill with insufficient permitted capacity to <br />accommodate the Project's solid waste disposal needs? <br />Finding: Less than significant impact. (DEIR, p. 2-8; Initial Study, p. 65.) <br />Facts in Support of Finding: The existing landfills that serve the project region have sufficient capacity <br />to accommodate the Project's solid waste needs. (Initial Study, p. 65.) For the reasons discussed above <br />and the reasons discussed in the DEIR, impacts associated with this issue would be less than significant, <br />and no mitigation is required. (Initial Study, p. 65.) <br />For the reasons discussed above and the reasons discussed in the DEIR, impacts associated with this issue <br />would be less than significant, and no mitigation is required. (Initial Study, p. 65.) <br />Resolution No. <br />Certification of the Magnolia at the Park EIR <br />75E-87 <br />Page 49 of 71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.