Laserfiche WebLink
Exhibit E-2 to 1st Amendment to <br />Siemens MSA (A-2017-289) <br />SIEMENS <br />la.at�.urlr. for G fit <br />City of Santa Ana — Downtown <br />60 Civic Center Drive <br />Santa Ana, CA <br />Change Order for Adds/Deletes Changes <br />Project Name: City of Santa Ana Downtown <br />5/7/2018 <br />Project Summary: During the course of the project there was additional work performed, <br />changes to equipment provided and minor scope changes. In order to accurately capture <br />equipment listed for warranty purposes and additional costs, the following items detail the <br />changes to our base scope of work. <br />i Engineering labor to convert micro station formatted drawings into AutoCAD <br />format in order to provide a working set of security drawings... $a,880.00 <br />Y Additional Modesta BCo5 coatings applied to the 7 Code Blue towers along with <br />the additional components (mounting ring, PA speakers and camera parapets). <br />The benefit of the additional coasting would be increased thickness, more <br />slickness, environmental protection, would help prevent the sharpie/spray <br />paintletc from bonding to the paint and easier to clean easier. This coating was <br />applied by a third party once the units were delivered by the <br />manufacture., $5,544.00 <br />4. Provide 7 spare Axis F1005 camera sensors for Code Blue Units,.$1,785.00 <br />d. Additional conduit, labor and electrical work required at the Senior Center in <br />order to accommodate the Code Blue unit installed at that location. Existing <br />electrical panel did not have the capacity to add any additional <br />breakers..$3,735,00 <br />i Siklu Point to Point Wireless Radio Upgrade. original scope included Ubiquid <br />wireless point4o•polnt devices for the Reagan Federal Courthouse, the Yost <br />Theater and the Artist Village rooftops; however, a more robust radio with newer <br />technology was available at the time of installation. The benefits of upgrading <br />the City to these radios were providing a larger more reliable bandwidth, they <br />operate on a FCC licensed frequency which provides a more secure frequency to <br />operate in and they are immune to weather related Interference, which all benefit <br />in better, faster and more reliable video... $6,98o,00 <br />i. Provided Cisco Smartnet t year Warranty on the new Cisco switches ..$1,354.00 <br />4. Furnish and install additional fiber from Telco closet to classroom F, to enhance <br />the network connectivity of the main monitoring location to better handle the <br />additional camera feeds, includes material, labor, terminate and test..$2,547.00 <br />SOW Page I 1 <br />