Laserfiche WebLink
City of Santa Ana <br />Hydro Turbine Generators <br />Project Cost Estimate <br />SA -3 Install New Turbine Generator in a New Vault <br />Equipment Description <br />Canyon Hydro Soar In Line Turbine 8.0 CFS, 90-120 psi, 183 kW max <br />Includes Soar ILT 12-33-9.0 Variable Flow Hydro Turbine, 1800 rpm, adjustable wicket <br />gates; US Motors Vertical Shaft 250 hp, 480 VAC Induction Generator; 12 inch <br />Electrically Actuated Turbine Inlet Valve; HPU to support wicket gate actuation with <br />accumulator sized to close wicket gates In power failure; Switchgear and Control Panels <br />with protective relays to utility grid standards <br />Commisioning Parts, Startup, Site Testing <br />Vault -Excavation, concrete, backfill, lid, sidewalk, landscaping <br />10'x 30' at $350/sf <br />Mechanical/Electrical Building Modifications <br />Construction, EPC Contractor <br />Demolition of Existing Plant (Offsetting with Salvage Value) <br />Salvage Value of Existing In Une Turbine <br />Shipping - In Line Turbine <br />Development Costs - Permitting, Interconnection, SCE <br />Balance of Plant Contingency <br />Subtotal <br />Materials + Labor <br />Sales Tax on Materials <br />Contractor Construction Management <br />Contractor 0&P <br />Contingency on Construction Contract <br />Design Engineering <br />City Project Management <br />City Construction Support <br />Project Total <br />References <br />1. Canyon Hydro Proposal 17 Aug 2018 <br />2. NAM <br />Extended Bare Bare labor <br />Bare Material Material Cost Costper Unit <br />Qty Cost Per Unit ($) ($) ($) <br />1 $ 261,000 $ 261,000 $ - <br />Extended <br />Bare Labor <br />Costs ($) Reference <br />$ 1 <br />0 $ <br />$ <br />$ - <br />1 <br />$ - <br />$ 10,000 <br />$ 10,000 <br />1 $ <br />15,000 <br />$ 15,000 <br />$ 20,000 <br />$ 20,000 <br />0 $ <br />$ <br />$ <br />0 $ <br />$ <br />$ <br />1 $ <br />10,000 <br />$ 10,000 <br />$ 10,000 <br />$ 10,000 <br />1 $ <br />- <br />$ - <br />$ 100,000 <br />$ 100,000 <br />1 $ <br />$ <br />$ <br />$ <br />1 $ <br />$ <br />$ <br />$ <br />1 $ <br />51000 <br />$ 5,000 <br />$ - <br />1 <br />$ <br />$ <br />1 $ <br />35,000 <br />$ 35,000 <br />$ 5,000 <br />$ 5,000 <br />1 <br />$ <br />$ - <br />1 $ <br />25,000 <br />$ 25,000 <br />$ <br />$ 351,000 <br />$ 145,000 <br />19H-112 <br />$ 496,000 <br />9.25% $ 32,468 <br />5% $ 24,800 <br />15% $ 74,400 <br />20% $ 99,200 <br />9% $ 44,640 <br />7% $ 34,720 <br />6% $ 29,760 <br />$ 835,988 <br />1 <br />1 <br />2 <br />2 <br />