Laserfiche WebLink
CQLTAlC <br />�r,vx or <br />V,esv Vewr Orra tivn,nuxrcai:nxa <br />Project#: 81.207B-D.1 <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of two (2) charging unit to meet NEC requirements, <br />Supply and Installation of four (4) 40A circuit breakers for EVCS overcurrent protection. <br />o Utilization of new electrical panel to supply four (4) 30A circuit to new charging unit, <br />o From the electrical panel(s) to new charging station, the new electrical conductors: #6, #8 and <br />#10 ground wires. <br />PROVISIONS FOR FUTURE GROWTH <br />• None <br />PARKING MODIFICATIONS <br />• Supply and installation of two (2) protective bollards per unit (total of four). <br />• Supply and mounting of four (4) EV parking signs. <br />• Stenciling/marking "EV CHARGING ONLY" for four (4) EV parking spaces. <br />RELATED CONSTRUCTION WORK <br />• Core drilling, <br />• Placement of EMT, approximately+15U, <br />INITIALS DATE <br />-10- <br />Videos Communications <br />:lion 1 12681a Drive, <br />d .. �ceove,:1s.� <br />Video Voice Data Commumcatiau I Voltaic Division 12681 Pala Dave, Garden Grove, CA 92841. Print Darn. November 15, zom <br />