Laserfiche WebLink
OLTAIC <br />u M1OIVI419N Pn <br />VIP4P VGIPL Flinn 0PMMYXIP491PXP <br />Project#; 81-207a-D.1. <br />Excludes: <br />• Plan check fees (if applicable) permitting fees, and/or any required Inspection fees required to conduct the <br />scope of work. Related fees may be paid for by contractor in advance to avoid delay of project, but shall be at <br />the expense of the owner or shall be reimbursable by the owner, <br />• Application/Reglstration for new utilities or other services. <br />• Conduit encasement for signal (low voltage) wiring. <br />• Any additional (outside the scope of work) circuit breaker installations or upgrades as required per NEC or <br />manufacturer's specifications. <br />• Payment bonds/performance bonds, apprenticeships. <br />• Custom framing, bracketing, strut, or other supporting accessories not supplied by manufacturer fabricated <br />to Install wall -mounted charging units on a non -typical structure. <br />• Notification to tenants or any affected parties of construction and/or power shutdown requirements. <br />• The supply or installation of any equipment protection such as bollards, wheel stops, etc. <br />• Site modifications such as ramping and accessibility path of travel for ADA standards. <br />INITIALS FATE <br />Clarification: <br />• No pricing is included for existing conditions/obstructions not evident prohibiting the completion as <br />specified. <br />• This proposal Is based on work being performed during normal business hours 7am—Spur Monday to Friday, <br />8-hours days, and/or a mutually agreeable schedule. Overtime and abnormal business hours Is not <br />considered. <br />• All conduit work Is unfinished unless specified otherwise. <br />• A cellular signal booster/repeater may be required for reliable communication with charging stations. During <br />the original site visit, professional test equipment is used to measure cellular signal levels and every effort to <br />determine the need for signal booster equipment is made. However, even If signal booster equipment Is not <br />Included with this quote, a need for signal booster possibly could arise in the future. Due to the nature of <br />cellular networks, changes in carrier equipment and services, possible future Interference, new construction <br />or other environmental changes that may represent line of sight obstructions and affect cellular signal levels, <br />a signal booster may be required after initial site walk and cellular signal measurements. Once the installation <br />of charging station(s) has been completed, the functionality of the wireless network capabilities will be <br />retested and verified to be within acceptable criteria established by the charging station manufacturer. If at <br />that time or any time thereafter it is determined that signal booster equipment is required, a separate quote <br />will be provided. <br />• This proposal assumes that the Integrity of all existing circuitry and electrical systems Is intact, all circuits and <br />electrical that are to remain are to code, and are operational. Any additional labor and material to fix or <br />repair the previously mentioned will be billed on a time and material basis at $88.50/hr, + material. <br />• Installation cost are based on prevailing wage requirements. <br />INITIALS DATE <br />•15- <br />>�+".��.'. <,,.ay.:., _�. rr�_L:?3.�Pv.S�.t _,:.�mz..= .n sa;�r. _,,;•L��i 'x_x�n�.,� ce� �xnz. �,,aw r1,'.�. ram';^as•rax n_*:'p'SfSJ1v,e,E -,. �r-;"3'ru �:�-.�1 <br />Video Voice Data Communications I Voltaic Division 112681 Pala Drive, Garden Grove, CA 92841 Print Date November 35, 2018 <br />