My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2019-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
05/21/2019
>
FULL PACKET_2019-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 8:41:42 AM
Creation date
5/16/2019 6:14:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
676
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />City of Santa Ana <br />Section 3 New Hire Calculation Form <br />Project Name: Residential Street Repair Program and Alley Improvement <br />Project Location: 1320 E. Sixth St., Ste 100 Corona CA 92879 <br />Street City State Zip <br />Contractor Name: EBS General Engineering, Inc. <br />Contractor Contact: <br />Contractor Telephone Number: <br />A. Nanci <br />951-279-6869 <br />Contractor Email Address: bids@ebsgeneral.com <br />Section 3 Resident Hiring Goals <br />Trade/Craft I Number of New Hires <br />Total Number of New Hires: I <br />Total number of Section 3 resident new hires necessary to comply with contract: <br />Signature of Contractor <br />2/19/19 <br />Date <br />23A-33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.