My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STATE OF CALIFORNIA DEPARTMENT OF REHABILITATION
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA, STATE OF
>
STATE OF CALIFORNIA DEPARTMENT OF REHABILITATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:52:44 PM
Creation date
5/30/2019 3:14:28 PM
Metadata
Fields
Template:
Contracts
Company Name
STATE OF CALIFORNIA DEPARTMENT OF REHABILITATION
Contract #
A-2019-070-05
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
5/7/2019
Expiration Date
6/30/2022
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2• With in a reasonable time prior to the start of ally on -site work, delivery or materials, equipment, or personnel, Contractor will submit to <br />Owner the following: <br />A- A complete set of drawings approved by Owner and subsequently by the City in which the Building is located. <br />B- A fully executed Indemnity Agreement (To Be Provided by Owner Upon Request), <br />C- Certificate of Insurance in a final approved by Owner executed by insurance companies acceptable to Owner. <br />D- A fully executed Notification -Rules for Contractors (To Be Provided by Owner Upon Request). <br />F- A job schedule of the work to be accomplished, detailed by trade. <br />F- A complete list of all proposed Subcontractors and suppliers. Owner must approve all contractors and subcontractors before <br />commencement of their work. <br />G- The name and phone number (including emergency phone numbers) ofpersonnel who are authorized to represent the Contractor. <br />3. No revisions or changes of any kind may be made to the construction plans previously approved by Owner without prior written consent of <br />the Owner, Any proposed revisions or changes must be submitted to Owner in the form of a change order, for Owner's review and <br />approval prior to commencement of such changes. Revisions or changes altering the floor plan, base building systems, or building <br />operations must be submitted, in writing, to the Owner for review and approval prior to commencement of work. <br />4. All of Contractor's work must be scheduled so that it in no way conflicts with, interferes with, or impedes the quiet and peaceful enjoyment <br />of other tenants or occupants of the Project, or with the progress of Owner's woic or operations. Any work that is in conflict will be <br />rescheduled by the Contactor to such time as approved by Owner. Additionally, Owner shall have no liability for any costs or expenses <br />incurred by Contractor (or Tenant) in connection with such rescheduling. <br />S. Contractor and subcontractor shall employ persons and means for (lie orderly progress of the work without interruption on account of <br />strikes, work stoppages or similar causes of delay. Additionally, Owner shall have no liability for any costs or expenses incurred by <br />Contractor (or Tenant) in connection will) such delays. <br />6. Materials and tool storage will be limited to the areas for which access has been granted. <br />7. Clean-up and rubbish removal shall be provided by the Contractor at Contractor's expense. Contractor must, on a daily basis, remove all <br />rubbish, surplus and waste material resulting mom the performance of his work. At tie request of Owner, Contractor shall relocate any <br />materials causing Sri obstruction as directed by Owner. Contractor will not be allowed to place a dumpster on site on a continuous basis <br />during construction. <br />Important note: The placement and location of rubbish dumpsters turd bins must be approved in advance by Owner. <br />8. In general, Owner will interface with Contractor to the extent necessary for work to be completed within tie guidelines of project <br />specifications and for the enforcement of building rules and regulations. <br />9. Contractor will make arrangements for unloading, trash removal and [totaling after normal working hours clue to die local city noise <br />ordinance. (No such activity will be allowed between the hours of 10:00 p.m, to 7:00 a.m.) Al no time will the Contractor be given <br />exclusive reserved use of the freight elevator unless applied fur by Contractor and approved by Owner. Contractor may be afforded access <br />to loading dock space and hoisting facilities for limited use at such time during annual working hours as is prearranged with Owner, or at <br />other times, with the consent of Owner and upon payment of Owner's prevailing fee for aRerho rS use and access. <br />I0. Contractor will be afforded unloading areas as prearranged with Owner, All materials unloaded at these mess will be moved to an area of <br />use immediately and shall not be stored or used in a way which adversely impacts use oflhe Building. <br />11. Contractor (and Tenant) will tie responsible for the security of its own materials, equipment and work, and that of his subcontractors. <br />Contractor will also be responsible fur damage caused by Contractor or its subcontractors to due Project, Building and/or tenant areas, <br />including, but not limited to the loading dock and indoor and outdoor public areas, freight elevators, etc. Any such damages will be <br />promptly repaired to the Owner's satisfaction at sole cost of Comr. actor. <br />12. Contractor will comply with all applicable codes, laws and regulations pertaining to the work of Conuractor, including all surely and health <br />mgulations. The Contactor shall supply the Owner with a Master List of all Hazardous Materials and their Material Solely Data Sheets <br />(MSDS) upon delivery to lhejub site. A discussion will then ensue pertaining to the sale storage, handling and use of these materials. as <br />well us the Contractors emergency preparedness plan Ibr handling the containment and clean-up of potential Hazardous Material spills, <br />13. Contractor will not engage in oily labor practice that may delay or otherwise impact die work of Owner or any other contractor. <br />14. No base building systems will be turned oft' or disengaged by Contractor or any subcontractor without prior written approval and <br />supervision by a representative orOwneror its agent. Said systems iucl tide but are not limited to sprinklers, electrical circuits. air -hands in,, <br />units, smoke heads and water supply, Building electrical power shut -downs are allowed, with the prior written consent ol'Owne. on <br />Saurlays between 10:00 p.m. and 3:00 a.m. only. A request for approval shall be made to the Property Manager at :cast ten (10) days in <br />advance. <br />VY W CAir Cearer Ur—Clo, nf.Sunra arm Lease -4- F.iehibit U <br />
The URL can be used to link to this page
Your browser does not support the video tag.