Laserfiche WebLink
EXHIBIT "F" <br />SERVICES AND UTILITIES <br />The services and utilities to be provided by Landlord are as follows: <br />I ElevotorService, Non -attended automatic elevator service. <br />2 J1VA . Subject to all governmental Laws, rules, regulations and guidelines applicable thereto, HVAC to the Premises during Business <br />Hours (defined below), which In Landlord's good faith judgment, is required for the comfortable use and occupancy of the Premises for general <br />office use, After Hours HVAC (defined below) may be provided to the Premises upon request by Tenant. Tenant shall pay to Landlord die After <br />Hours HVAC Rate (defined below) for all After Hours HVAC that is so requested by Tenant within ten (10) days of receipt of Landlord's reasonably <br />detailed bill therefor. Tenant shall be responsible for and shall pay to landlord any additional costs incurred by Landlord because of the failure of <br />the HVAC system to perform its function due to: (a) arrangement of partitioning in One Premises or changes or alterations thereto, (b) any use by <br />Tenant in any portion of the Premises of heat -generating machinery or equipment other than normal office equipment, or (c) any occupancy of any <br />portion of the Premises at densities above customary general office levels. "Business Hours" means 6:00 AM. to 6:00 P.M. Monday through Friday, <br />and upon Tenant's request, 9:00 AM. to 1:00 P.M. on Saturdays, in all cases excluding the date of observation of any Holiday (de Fined below). <br />"Holiday" means each of New Year's Day, Independence Day, Labor Day, Memorial Day, Thanksgiving Day, and Christmas Day, and at Landlord's <br />discretion, any other state or nationally recognized holiday that is selected by Landlord acting consistently with Institutional Owner Practices. "After <br />Hours HVAC" means any HVAC that is provided to all or any portion of die Premises at the request of Tenant outside of Business Hours. The <br />"After Hours HVAC Rate" means the Landlord's prevailing charges for supplying After Hours HVAC to the Premises, which as of the Effective <br />Data is $65,00 per zone (or partial zone), per hour (orpatial hour), subject to a two (2) hour minimum. <br />Elc rle t . <br />3.1 At all reasonable times, electric current as required for Building Standard lighting and factional horsepower office machines and <br />adequate electrical facilities for connection to the lighting fixtures and incidental use equipment of Tenant; provided that Tenant shall be responsible <br />for distributionofelectrical power from the electrical panels located on die floor(s) of the building on which the Premises is located, Subject to <br />Section 33 of this Exhibit 'f : (a) die electricity so furnished for Tenant's Incidental use equipment to be at a nominal one hundred twenty (120) <br />volts and with no electrical circuit for die supply of such equipment to require a current capacity exceeding twenty (20) amperes mid (b) the <br />electricity so furnished for Tenant's lighting to be at a nominal one hundred twenty (120) volts and with no electrical circuit for the supply of such <br />lighting to require a current capacity exceeding twenty (20) amperes, <br />3.2 Notwithstanding any provision of this Lease to the contrary: (a) Tenant covenants that its use of electric current shall never <br />exceed the capacity of the feeders, risers or electrical installations of the Building or the Project, (b) the total connected electrical load for Tenant's <br />incidental use equipment within the Premises shall in no case exceed Landlord's per usable square foot slanda'd, and (c) the total connected electrical <br />load for Tenant's lighting fixtures within the Premises shall in no ruse exceed Landlord's per usable square foot standard. in addition, if Tenant's <br />actual consumption of electrical power in the Premises, as determined in good faith by Landlord pursuant to such measurement method or methods as <br />Landlord shall employ from time to tore (including, without limitation, the use orsubmeters and/or pulse meters, electrical surveys and/or engineer's <br />estimates) exceeds the Electrical Power Consumption Threshold (defined below), Tenant shall pay to Landlord, as Additional Rent in addition to <br />those costs otherwise payable by'renant pursuant to Article 4 tan sum ot1 It) Landlord's actual direct and indirect costs of supplying such excess <br />consumption, Including, without limitation, all tares thereon, and the cost of additional weer on Building Systems resulting from such excess <br />consumption, (ii) all of Landlord's costs of monitoring and measuring such excess consumption and (ill) Landlord's reasonable administration fee <br />thereon. The "Electrical Power Consumption Threshold" means, for any reasonable calculation period determined by Landlord, the Landlord's <br />nondiscriminatory per usable square foot standard for electrical consumption (which is intended to represent the average rate of consumption (a kW <br />per usable square foot basis) during Business Hours, of an average general office tenant orthe Building). <br />3.3 Without Landlord's consent, Tenant shall not install, or permit the installation, in the Premises of any lighting, computers, word <br />processors, electronic data processing equipment or other type of equipment or machines which (a) will require a voltage other than a nominal 120 <br />volts or require a current capacity exceeding twenty (20) amperes or (b) will increase Tenant's use of electric Curren in excess of that which <br />Landlord is obligated to provide pursuant to this Section3ol'lhis hibit" "("Excess Electrical Requirements"), If Tenant shall requireormtilize <br />Excess Electrical Requirements or electric current which niny disrupt tie provision ofelectrical service to other tenants in the Building or the Project, <br />Landlord, at its election: (i) may refuse to grant its consent or (it) may condition its consent upon Tenant's payment in advance of Landlord's total <br />direct and indirect cost (including, without limitation, a reasonable adminisnvthm fee) or designing, installing, maintaining and providing any <br />additional facilities determined by Landlord to be required to sntist'y such Excess Electrical Requirements (or otherwise related to the additional wear <br />on Building Systems associated therewith). If Tenant's increased electrical requirements will materially ar'ect the temperature level in the Premises <br />or in the Building, Landlord's consent may be conditioned upon Tenants payment of all direct and indirect costs of installation and operation ofany <br />machinery or equipment necessary to restore the temperature level to that otherwise required to be provided by Landlord, including, but not limited <br />to. the cost orniodilications to the Building Systems slid increased wear and tear on existing IIVAC equipment. Landlord shall not, in any, way, be <br />liable or responsible lu Tenant for any loss or damage or expense which Tenant mill, incur or sustain if. for any reasons beyond Landlord's <br />reasonable control, either the quantity or character of electric service is chenged or is no longer available or suitable ter Tenant's requirements, <br />WON - City wale,- for drinking and rest room purposes. <br />5 Janitorial Service. Janitorial and cleaning services, five (5) days per week (excepting Holidays). conforming to the Project standards in <br />elTect from time to time; provided that Landlord shall have no obligation to provide such services to any portions otlhe Premises that ae not used <br />exclusively for general office purposes. In all events, Tenant shall pay to Landlord the cost otremoval of Tenants refuse and rubbish, to the extent <br />that the same exceeds the refuse and rubbish attendant to normal office usage andlor to the extent that Tenant rails to keep the Premises in reasonable <br />order. <br />801 111 CJrde Comer•Dr—Cfo, ofSnraa Ana Leine .I • Exhibit F <br />