My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 GENERAL SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION <br />MEASURES <br />2.1 Land Use <br />.b <br />The project would result in the demolition of Mainstreet <br />Center, rehabilitation of Fashion Square and provide a maximum <br />development of 3,100,000 square feet of office/retail commercial use <br />:a <br />�.: <br />and 1,200 hotel rooms on the site. The project is consistent with the <br />Community Shopping Center land use designation for the site while a <br />small portion of the site would require a zone change from R-1 (Single <br />Family Residential) to C-2 (General Commercial). The tenants of <br />Main Street Center and some Fashion Square tenants will require <br />relocation due to the project. The project would accomplish the <br />objectives of the Redevelopment Plan by revitalizing and restoring the <br />economic, physical and social health of the Redevelopment Project Area. <br />Without mitigation, the project would result in the loss of <br />!. <br />approximately 198 parking spaces used for parking for the KLST-owned <br />Fidelity Federal Savings building, but mitigation measures are available <br />which would allow that building to retain an acceptable level of parking <br />�- <br />spaces in accordance with City code standards. <br />4Ly <br />0 <br />Mitigation Measures <br />I. <br />(a) The project should be landscaped similar to or more <br />extensive than the existing landscaping in order to buffer the <br />Ib <br />development from surrounding residential areas as much as possible. <br />r <br />(b) All tenants displaced by the project will be provided <br />assistance in accordance with State law and Santa Ana Redevelopment <br />Agency policies. <br />IY <br />(c) The Agency and the Project Participants should offer KLST <br />" land (including the Agency owned land to the south of the Fidelity <br />Savings Building and a portion of the project site in the near vicinity) <br />75D-146 <br />
The URL can be used to link to this page
Your browser does not support the video tag.