My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br />1 <br />6. Provide funding to install traffic signals on La Veta <br />Avenue at Bedford Road and the southbound Rte 57 Fwy <br />off -ramp. <br />7. Develop and implement an aggressive TSM Program to <br />maximize use of transit, ride sharing and staggering of <br />work hours with a goal of achieving a 20 percent <br />reduction in overall trip generation. <br />8. Develop an on -site pedestrian circulation plan with <br />buildings designed to accommodate second level access <br />from a transit station and/or a pedestrian bridge located <br />in the vicinity of Main Street/Town and Country road. <br />75D-1750 <br />
The URL can be used to link to this page
Your browser does not support the video tag.