My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 REGIONAL SETTING AND RELATED PROJECTS <br />i <br />There are a number of other current ,and potential projects in <br />the vicinity of the proposed Fashion Square Commercial Center Site <br />project which could be expected to contribute to cumulative <br />environmental impacts in the general area. These "cumulative projects" <br />include a variety of proposed uses (i.e., Residential, Office, <br />Commercial/Retail, and Hotel) located within the City of Santa Ana and <br />the City of Orange. Table 3, Cumulative Projects, summarizes these <br />k "cumulative projects", giving a brief description of their relative size <br />F <br />(approximate square footage), proposed use, and their present status. <br />Figure 6 shows the location of the cumulative projects in relationship <br />to the proposed subject. <br />1 <br />The "cumulative projects" listed in Table 3, in addition:to <br />the proposed Fashion Square Commercial Center Project, will provide the <br />basis for the cumulative impact analysis discussed in the Impacts <br />Sections of this EIR. <br />f <br />J It should be noted, however, that some of these "cumulative <br />k projects" are quite speculative and may never be developed to the extent <br />l described in Table 3. In particular, the "Hurwitz site" is not <br />currently proposed for any specified development and the numbers given <br />for that site represent merely a preliminary development proposal which <br />was subsequently abandoned. <br />i <br />The approach taken in this report was to assume a maximum <br />density scenario in order to determine the maximum possible magnitude of <br />environmental effects. The listed "cumulative projects" should <br />therefore be viewed only as illustrative of the types and magnitude of <br />j future development which could occur in the vicinity of the Fashion <br />Square project if and when economic conditions ever become favorable to <br />such large-scale new development. <br />75D-Y73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.